Harrie Leenders PHAROS INTERIOR Скачать руководство пользователя страница 3

3

 

September 2013 

Pharos Interior Manual 

These instructions together with those in the instruction booklet cover the basic 
principles to ensure the satisfactory installation of the stove, although detail may 
need slight modification to suit particular local site conditions. 
 
In all cases the installation must comply with current Building Regulations, Local 
Authority Byelaws and other specifications or regulations as they affect the      
installation of the stove.

 

It should be noted that the Building Regulations requirements may be met by 
adopting the relevant recommendations given in British Standards BS 8303, BS 
EN 15287-1:2007 as an alternative means to achieve an equivalent level of       
performance to that obtained following the guidance given in Approved        
Document J.

 

 

Please note that it is a legal requirement under England and Wales Building 
Regulations that the installation of the stove is either carried out under Local   
Authority Building Control approval or is installed by a Competent Person        
registered with a Government approved Competent Persons Scheme. HETAS Ltd 
operate such a Scheme and a listing of their Registered Competent Persons can 
be found on their website at www.hetas.co.uk. 

 

CO Alarms:- 
Building regulations require that when ever a new or replacement fixed solid fuel 
or wood/biomass appliance is installed in a dwelling a carbon monoxide alarm 
must be fitted in the same room as the appliance. Further guidance on the         
installation of the carbon monoxide alarm is available in BS EN 50292:2002 and 
from the alarm manufacturer’s instructions.  

 

Provision of an alarm must not be considered a substitute for either installing the 
appliance correctly or ensuring regular servicing and maintenance of the          
appliance and chimney system. 

 

HEALTH AND SAFETY PRECAUTIONS 

 

Special care must be taken when installing the stove such that the requirements of the 
Health and Safety at Work Act are met. 

 

Handling 

Adequate facilities must be available for loading, unloading and site handling. 

 

Fire Cement 

Some types of fire cement are caustic and should not be allowed to come into contact 
with the skin.  In case of contact wash immediately with plenty of water. 

 

Asbestos 

This stove contains no asbestos. If there is a possibility of disturbing any asbestos in 
the course of installation then please seek specialist guidance and use appropriate  
protective equipment. 

 

Metal Parts 

When installing or servicing this stove care should be taken to avoid the possibility of 
personal injury. 
 

Содержание PHAROS INTERIOR

Страница 1: ...1 September 2013 Pharos Interior Manual INSTRUCTIONS FOR INSTALLATION USE AND MAINTENANCE...

Страница 2: ...2 September 2013 Pharos Interior Manual...

Страница 3: ...ersons can be found on their website at www hetas co uk CO Alarms Building regulations require that when ever a new or replacement fixed solid fuel or wood biomass appliance is installed in a dwelling...

Страница 4: ...building in accordance with the provisions of Building Regulations Approved Document J If installation is into an existing chimney then it must be sound and have no cracks or other faults which might...

Страница 5: ...Adequate provision e g easily accessible soot door or doors must be provided for sweeping the chimney and connecting fluepipe where it is not intended for the chimney to be swept through the applianc...

Страница 6: ...in this area Connection to chimney Stoves may have a choice of either a rear or top flue gas connector that allows connection to either a masonry chimney or a prefabricated factory made insulated meta...

Страница 7: ...to use a fireguard to BS 8423 2002 Replaces BS 6539 in the presence of children aged and or infirm persons Installation It is prohibited to carry out unauthorised alterations to the stove There must...

Страница 8: ...8 September 2013 Pharos Interior Manual CONTENTS Parts of the Pharos Interior 9 Sizes 10 Regulations 11 Manual 12 Installation Instructions 16...

Страница 9: ...9 September 2013 Pharos Interior Manual 1 Convection slots 2 Glass 3 Control flap 4 Spark screen...

Страница 10: ...10 September 2013 Pharos Interior Manual...

Страница 11: ...11 September 2013 Pharos Interior Manual...

Страница 12: ...12 September 2013 Pharos Interior Manual...

Страница 13: ...13 September 2013 Pharos Interior Manual...

Страница 14: ...14 September 2013 Pharos Interior Manual...

Страница 15: ...15 September 2013 Pharos Interior Manual...

Страница 16: ...16 September 2013 Pharos Interior Manual...

Страница 17: ...17 September 2013 Pharos Interior Manual...

Страница 18: ...18 September 2013 Pharos Interior Manual...

Страница 19: ...19 September 2013 Pharos Interior Manual...

Страница 20: ...20 September 2013 Pharos Interior Manual...

Страница 21: ...21 September 2013 Pharos Interior Manual...

Страница 22: ...22 September 2013 Pharos Interior Manual...

Страница 23: ...23 September 2013 Pharos Interior Manual...

Страница 24: ...24 September 2013 Pharos Interior Manual Robeys Ltd Goods Road Industrial Estate Belper Derbyshire DE56 1UU Tel 01773 820940 Fax 01773 820477 E mail info robeys co uk www robeys co uk...

Отзывы: