6
Installation of the water treatment plate
1.
Attach the water treatment unit to a solid wall. Fix both the lower and upper part
of the plate.
2.
Insert pH and chlorine electrodes into the electrode holders. Fix the nut with pliers
or wrench to tighten the cap. Failure to do so may result in a leak and is not
covered under warranty.
3
Create a separate grounding for your Salt Electrolysis with grounding pen.
4
Connect water inlaat and water outlet, so that the water passes the Redox and pH
measuring electrode first and then along the salt electrolysis (or vice versa)..
The preference is for a bypass configuration installation:
Содержание Hydrolyse EC20
Страница 1: ......