SL600 PINNACLE STAIR LIFT:
Install Manual
30SEP2020 | P/N: 76015 REV F
16
INSTALLATION
PINNACLE STAIR LIFT: SECTION 4
FOLDING RAIL
INSTALLATION
NOTE: The photos in this section shows a left folding rail,
assembled to be installed on the left side of the stairway.
Contact Harmar Technical Support at 800-833-0478
for
instructions on how to switch a folding rail from the left
side to the right side.
1. Orient the two(2) rail brackets onto the
folding rail, with the nuts on the same side as
the folding mechanism.
See Figures 4-35 and 4-36.
Figure 4-35
Figure 4-36
2. Expand and snap the two (2) brackets over the
rail, so the top is in the bracket-groove.
See Figures 4-37.
Figure 4-37
3. Partially tighten the two nuts that position
these on the rail, using 1/2" wrench (deep
socket preferred), so they won't slide when
you're test-fitting the position. See Figure 4-38.
Figure 4-38
4. Place the rail onto the stairway with the
bottom bracket on the second step, as shown.
NOTE: The bottom feet should approximately rest
on the floor with the rail straight, but they will be
adjusted later.
See Figure 4-39.
Figure 4-39