5
3-90-70738R9_08/13
ASSEmblY
Firebrick diagram
blower
The blower slides into the channel bracket on the rear of
the stove as shown at right. Plug the blower into a properly
grounded receptacle.
Shaker handle
The shaker handle installs onto the shaker handle mount
using the two hex-bolts and washers provided.
Firebricks
The SF250 uses 14 “standard” firebricks, as shown below.
These standard firebricks measure 9” X 4½” X 1¼” each.
The firebricks are already installed in the stove but can be
removed to lighten the stove for moving. The doors can also
be removed by simply lifting them off of the hinges.
Содержание SF 250
Страница 4: ...4 3 90 70738R9_08 13 7 8 35 3 4 5 13 16 32 5 8 36 11 16 42 15 16 20 1 2 42 15 16 Specifications...
Страница 13: ...3 90 70738R9_08 13 testing label This appliance is also approved for installation into a shop S A M P L E...
Страница 16: ...16 3 90 70738R9_08 13 Date Of Service Performed By Description Of Service Service Maintenance Log...
Страница 17: ...17 3 90 70738R9_08 13 notes...