System installation
11
connect more than fifty, use an unmanaged Ethernet switch to split the P3 data link into branches, each
containing less than fifty P3 PowerPort 1500s.
8. Connect the P3 PowerPort 1500™ to AC mains power at 100 - 240 V, 50/60 Hz as described in its user
manual.
9. connect the P3 system controller to AC mains power and power the controller on.
You can now configure the system at the P3 controller. See”System setup” on page 18.
Max. 45 VC-Strip 16x1 modules
or 60 VC-Strip 8x1 modules total per chain
Max. 4 chains per
P3 PowerPort 1500
AC mains
power
P3 System Controller
P3 PowerPort
1500
P3 PowerPort
1500
AC mains
power
AC mains power
P3 video data link (Ethernet cable)
Hybrid (DC power and data) link
Figure 6: P3 system layout
H
ybr
id-to-P
C
B
adapter c
ab
le
Hybr
id PCB-
to
-P
C
B
ca
b
le
Hybr
id P
C
B-
to-PCB cab
le
Содержание Martin VC-Strip 90357280
Страница 1: ...VC Strip User Manual...
Страница 30: ......
Страница 31: ......
Страница 32: ...www martin com Olof Palmes All 18 8200 Aarhus N Denmark Tel 45 8740 0000 Fax 45 8740 0010...