Installation with A hot Air System

Electrical interconnection of the HF60 to an existing heat pump, or fuel-fired hot air furnace: 

Interconnection with a heat pump will generally require a second thermostat to be installed. It is recommended that a new 

electronic thermostat be installed as close to the existing thermostat as possible. Installing within one foot of the existing 

thermostat is recommended for ease of interconnection and similar temperature sensing ability. 
If programmability is desired, both thermostats should have this capability. If only the new thermostat is programmable, you’ll 

need to keep the existing thermostat set several degrees below the lowest programmed temperature setting of the new 

thermostat. NOTE: In this configuration, if the HF60 cannot maintain the desired thermostat setting, the room will be allowed 

to cool to the lower set point of the existing thermostat before allowing the heat pump to operate. 
Special note: Even if the heat pump has a multi-stage thermostat, it cannot be re-wired to make the first stage control the 

HF60, and the second stage control the heat pump. All multi-stage heat pump thermostats are interconnected so that the 

compressor unit and/or the changeover solenoid activate with the first stage only.

Controlling the existing furnace fan during overheat situation.

 

Following the wiring diagram on the next page, you will need to supply and install a piece of 18/3 Thermostat wire between 

the low-voltage control terminal strip on the upper left-hand side of the HF60’s control cover, to the low-voltage control of 

the existing furnace. 

Note: Some systems may have external terminals and some may have them enclosed within the unit. If the connections 

to the existing system need to be made internally, be sure to use the proper protective grommet or connector where 

passing through the cabinet of the existing unit. 

If the wiring used does not match the colorings listed, follow the corresponding numbers on the terminal strips to ensure 

proper connection.

Step 1.  Disconnect electrical power to the existing heating system.
Step 2.  Install the above mentioned thermostat wire between the two systems
Step 3.  Connect the three (3) wires to the HF60 control terminal strip as indicated.
Step 4.  Remove the green wire which comes from the existing thermostat and connects to the terminal marked “G” on the 

existing system and splice it to the green (or #1) wire from the HF60.

Step 5.  Connect the white wire (or #5) from the HF60 to the “G” terminal of the existing system. This white wire should be 

the only wire connected to “G”.

Step 6.  Now, the red (#3) wire from the HF60 should be added to the “R” terminal of the existing system. Do not remove or 

replace any existing wires from “R”, just add this one to them.

Restore power to the existing system only. Using the existing thermostat, increase the setting to verify that the system works 

as it did prior to the interconnection. Increase and decrease the thermostat a few times to verify proper reaction. In the case 

of a heat pump system, be sure the outdoor compressor unit is also cycling. Notice: Most compressors have a built in lockout 

timer (usually 5 minutes) so you may need to wait between thermostat adjustments to verify proper operation. 
Once you are certain that nothing changed with the operation of the existing system, turn the existing system’s thermostat 

down far enough that it won’t come on during the test. Connect power to the HF60, and turn on the circuit breaker on the 

front of the unit. With the control in the “OFF” position, turn the feed adjuster knob to “Test”. When the OVERHEAT SAFETY 

ZONE light illuminates, the fan on the existing system should come on. Be sure that the fan is the only thing on. There should 

be no power to the compressor or the oil or gas burner.

Содержание HydroFlex 60 Pellet Boiler

Страница 1: ...mit CETTE GUIDE D UTILISATION EST DISPONIBLE EN FRANCAIS CHEZ VOTRE CONCESSIONNAIRE DE HARMAN save these instructions Installation Operating Manual Model s HydroFlex 60 Pellet Boiler NOTICE SAVE THESE...

Страница 2: ...Pellet Vent Combustion Blower Temperature Pressure Gauge Pressure Relief Valve Firebox Door Control Board Combustion Blower Cover Circuit Breaker Power Cord Heating System Supply Return either side R...

Страница 3: ...rts 44 Start Up Quick Reference Back Cover Contains updated information Harman Central Heating Appliances are built and tested to be complete Home Heating solutions As with any Central Heat system a b...

Страница 4: ...parate from the vent passage Outside Air Components Water Piping Supports Item 2 00 232044B secures to the boiler and gives the support needed for the expansion tank and circulator while keeping them...

Страница 5: ...trol board The wires can be connected to the sensor with wire nuts or butt splice connectors Installation Boiler Kit Materials Refer to page 3 List of items shipped with the unit 1 3 4 Boiler Drain 1...

Страница 6: ...re used or stored in quantities above that of normal use Installation Floor Protection The striped area indicates the minimum required floor protection area if the boiler is going to be placed on a co...

Страница 7: ...l Alc ve Minimum Alcove Depth 60 1524 mm Profondeur de l Alc ve WARNING RISK OF FIRE Hearth Home Technologies disclaims any responsibility for and the warranty and agency listing will be voided by the...

Страница 8: ...If you see deposits developing on the wall you may need to extend this distance to accommodate your installation conditions H A vent must not be installed within 3 feet 90 cm above a gas meter regulat...

Страница 9: ...tween the layers This air space acts as an insulator and reduces the outside surface temperature to allow a minimum clearance to combustibles as low as 1 inch In Canada the minimum clearance to combus...

Страница 10: ...ut cover Fig 5 Any exterior venting vent pipe exposed to outside ambient temperatures should be kept to a minimum due to potential condensation problems This is especially important in high humidity c...

Страница 11: ...including air conditioners Vents should not be placed below ventilated soffits Avoid venting into alcove locations Vents should not terminate under overhangs decks or onto covered porches Maintain min...

Страница 12: ...counted for in the pellet appliance installation Heat rises in the house and leaks out at upper levels This air must be replaced with cold air from outdoors which flows into lower levels of the house...

Страница 13: ...nimize moisture and creosote it is strongly recommended that some method of temperature balance is incorporated into the return system EXAMPLE OF A TYPICAL MULTI ZONE HEATING SYSTEM WITH BOILER BYPASS...

Страница 14: ...er water system it is recommended that some form of boiler water treatment be used Installation Plumbing EXAMPLE OF PIPING WITH AN INDEPENDENT CIRCULATOR SYSTEM CONNECTED TO AN EXISTING OPERATIONAL BO...

Страница 15: ...trongly recommended that some method of temperature balance is incorporated into the return system EXAMPLE OF PIPING IN PARALLEL WITH AN EXISTING OPERATIONAL BOILER BOILER DRAIN 3 4 NPT MALE X 3 4 HOS...

Страница 16: ...Y 1 2 NOTICE When installing with the Atmospheric Conversion all of the pressurized system components shown are not necessary Air vents or bleeders should be removed from the plumbing system to preven...

Страница 17: ...IRCULATOR AND INDIVIDUAL ZONE VALVES NOTE ALWAYS REFER TO THE INDIVIDUAL COMPONENTS RECOMMENDED INSTALLATION INSTRUCTIONS FOR THE PROPER MOUNTING POSITION AND LOCATION WITHIN THE PIPING SYSTEM AIR VEN...

Страница 18: ...into the return system EXISTING GAS OIL FURNACE OR ELECTRIC HEAT PUMP NOTE NEVER INSTALL HOT WATER COIL ON THE RETURN SIDE OF THE HEATING SYSTEM ITEMS SUPPLIED PRESSURE REDUCING VALVE PRV OR COMBINAT...

Страница 19: ...use the proper protective grommet or connector where passing through the cabinet of the existing unit If the wiring used does not match the colorings listed follow the corresponding numbers on the ter...

Страница 20: ...essor Fan Control 24 VAC hot 24 VAC com factory wiring HIGH VOLTAGE ORANGE from control board HIGH VOLTAGE N SPLICE by installer by installer HIGH VOLTAGE L1 by installer N L set 3 above existing t st...

Страница 21: ...h grommet HIGH VOLTAGE L1 HIGH VOLTAGE N HIGH VOLTAGE ORANGE from control board SPLICE SPLICE The top two screws only on the 5 pole terminal strip O A sensor terminals EXISTING BLOWER CONTROLS to circ...

Страница 22: ...ENLARGED VIEW by installer SPLICE HIGH VOLTAGE ORANGE HIGH VOLTAGE N to circulator outlet R1 RELAY R2 RELAY factory wiring 6 4 8 5 3 1 7 by installer by installer by installer HIGH VOLTAGE L1 LOW VOL...

Страница 23: ...GE from control N L 1 RED Grainger 2XC02 Omron LY2F 120V Installer Supplied Wireless T stat Receiver by INSTALLER 18 2 THERMOSTAT WIRE INSIDE EXISTING HVAC CONTROL SECTION OUTSIDE AIR SENSOR OUTSIDE A...

Страница 24: ...low draft setting should be between 45 and 55 IWC Depending on the amount of vertical rise it may not be possible to get a low draft reading in this range In this case re positioning the fan blade fu...

Страница 25: ...for the first minute Then the combustion blower will stay on low Overheat Safety Zone Light Indicates that the boiler water temperature has reached 210 Degrees F Igniter Light Indicates power to the i...

Страница 26: ...eating System The boiler is designed to withstand lower return water temperatures However extended return temperatures below 140 degrees F can cause condensation NOTE If the system is run at the lower...

Страница 27: ...in tempera ture rise of the Outside Air Example 1 OAT Water Temp Degree Change Max set at 185 65 140 45 Min set at 140 60 145 40 55 150 35 50 155 30 45 160 25 40 165 20 35 170 15 30 175 10 25 180 5 2...

Страница 28: ...rape the hole grid surface downward into the burn pot When the stove is ignited these scrapings will be pushed out by the feeder CAUTION Wear Heat Resistant Gloves To Perform The Scraping Procedure 3...

Страница 29: ...nburned or partially burned pellets are found in the ash pan this may also indicate a need for scraping the burn pot If you need to keep the feed adjuster on it s maximum setting your unit is under si...

Страница 30: ...e burnpot 8 Fill the burnpot with pellets as shown See Fig 14 Only fill level with the front edge DO NOT OVERFILL 9 Have matches or other ignition source ready 10 Turn Mode Selector to desired MIN TEM...

Страница 31: ...e of burn to the proper level according to the MAX TEMP dial setting Solid fuel burning appliances need to be cleaned frequently because soot creosote and ash may accumulate If you suspect a chimney v...

Страница 32: ...er This area only needs to be cleaned twice a heating season unless excessive buildup is noticed during scheduled cleanings There is a cover on the front of the burnpot to gain access to the air chamb...

Страница 33: ...into the unit on a rail system This keeps the ash pan from contacting the sides and floor refractory panels Caution must be taken to ensure thereisnothingonthefloorsurfacepriortoinsertingtheashpan Ash...

Страница 34: ...n use as a cleaning device Simply work the spiral up and down approximately 6 inches to scrape the inside surface of the heat exchange tube s The removed debris will fall to the ash pan and on the ang...

Страница 35: ...l flue pipe directly above the boiler is the first place fly ash will settle due to the slowing of flue gas velocity through horizontal pipe Cleaning of horizontal venting pipes is very important to t...

Страница 36: ...stion blower only shut down Your appliance will pulse the blower every few seconds to clear exhaust until the fire is out NOTE The UPS provides safe shut down only It is not intended for continued ope...

Страница 37: ...ket a new glass and a new 1 4 white gasket Re install the cover plate While making sure that everything is centered tighten the 4 nuts to secure the glass To install the screen plate insert it into th...

Страница 38: ...HAS GONE OUT 1 No pellets in hopper 2 Draft setting is too low 3 Something is restricting fuel flow 4 Feed motor or combustion blower has failed 5 Power failure or blown fuse 6 Firebox door or hopper...

Страница 39: ...hour 8500 BTU per pound figures Electrical 120 VAC 60 Hz Combustion blower 1 4 AMP Auger motor 7 AMP Igniter element 2 3 AMP Control board 05 AMP Approximate operating wattage 2 KWH Shipping Weight I...

Страница 40: ...WITCHED CIRCUIT BREAKER PROTECTED GREEN YELLOW GREEN YELLOW LT BLUE RED LT BLUE GREEN WHITE GREEN FAN ZONE CONTRL FAN ZONE CONTRL FAN ZONE CONTRL LOW VOLTAGE HIGH VOLTAGE OUTSIDE AIR SENSOR OUTSIDE AI...

Страница 41: ...w home construction warranty coverage begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever oc...

Страница 42: ...NS This warranty does not cover the following Changes in surface finishes as a result of normal use As a heating appliance some changes in color of interior and exterior surface finishes may occur Thi...

Страница 43: ...ve Profondeur de l Alc ve Des Combustibles au Devant du Po le At 16 of pipe length distance from the flue collar while maintaining listed clearances from appliance body Un tuyau de grandeur de distanc...

Страница 44: ...g manufacturing date Active Part number list on following page 1 3 2 4 5 6 7 8 11 16 17 21 22 32 33 34 36 35 37 23 25 24 38 39 40 41 42 43 44 45 46 47 48 49 51 53 54 55 56 57 58 59 60 19 52 50 20 18 2...

Страница 45: ...Lid Assembly 1 00 232038 9 Feeder Shield Rear 2 00 232039B Y 10 1 Foil Faced Fiberglass Insulation 3 44 232085 11 UL Feeder Assembly refer to feeder assembly page 12 Differential Switch 3 20 6866 Y 13...

Страница 46: ...rebrick 3 40 232093 Y 40 Firebox Refractory Bottom 3 40 232006 Y 41 Ash Pan Assembly 1 10 232049A Y 42 Ash Door Assembly 1 10 232019A Ash Door Spacer Set w Gasket 1 00 232074 Glass 5 25 x 5 25 3 40 55...

Страница 47: ...req 3 31 00927 Y 3 8 16 x 1 4 Alloy Steel Black Oxide Cup Point SSS Pkg of 25 3 30 2014 25 Y 3 Position Terminal Block 3 20 03018 Y Amtrol Air Vent 3 10 70130 Circuit breaker 10 Amp orange on off swit...

Страница 48: ...11 4 Pellet Air Intake Assembly 1 10 06810A 11 5 Gasket Feeder Air Intake Pkg of 6 3 44 72224 6 Y 11 6 UL Feeder Air Intake 1 10 232114 11 7 Gasket Ultra Air Intake Pkg of 10 3 44 677160 10 Y 11 8 Ul...

Страница 49: ...49 3 90 233R24_11 13 Service Maintenance Log Date Of Service Performed By Description Of Service...

Страница 50: ...50 3 90 233R24_11 13 Service Maintenance Log Date Of Service Performed By Description Of Service...

Страница 51: ...e This powerful heating appliance boasts uncompromising attention to detail and helps preserve our planet by using environmentally responsible fuels Signature of Boxer Your premium quality hearth prod...

Страница 52: ...back to the 4 or previously known setting 7 Turn the MAX TEMP dial to the desired temperature 8 Turn MIN TEMP dial to the desired settings 9 Flip the igniter switch to Auto The boiler will ignite if t...