QUICK START GUIDE

MET-13E 

Metreau

®

 13-Button Ethernet Keypad

Overview

This guide pertains to the MET-13E Metreau 13-Button Ethernet Keypad (

FG5793-02

). 

The purpose of this document is to illustrate how the device is to be installed and set up 

in its simplest configuration by a trained technician.

Environmental Requirements

The environmental requirements for the MET-13E are as follows:

Operating Temperature

: 32° F (0° C) to 104° F (40° C)

Storage Temperature

: 4° F (-15° C) to 140° F (60° C)

Operating Humidity

: 5% to 85% RH

NOTE: Intended for indoor use only.

Dimensions

HWD: 4 11/16" x 6" x 1" (119mm x 152.5mm x 26mm)

Weight

Approximately 0.35 lbs. (0.16 kg)

Power

You can apply power to the MET-13E via any Power-over-Ethernet (PoE) injector or 

switch which conforms to the 802.3af standard. Before installing and mounting the 

Keypad, test to see that it can receive power.

Applying Power

Applying power to the MET-13E requires category cable and a PoE injector, such as the 

PS-POE-AF-TC (

FG423-83

) available from AMX. The network must be connected 

through the PoE injector to send power to the Keypad. The category cable should only 

run through a common building. (A common building is defined as: Where the walls of 

the structure(s) are physically connected and the structure(s) share a single ground 

reference.)
1.

Connect the PoE injector to an AC outlet (~100-240V) using a standard power 

cord.

2.

Connect the switch category cable to the Data In port on the PoE injector.

3.

Using a separate category cable, connect the Data & Power Out port on the PoE 

injector to LAN Port on the Keypad.

Changing Buttons

The easiest way to remove and replace buttons on the keypad is to place the keypad 

assembly face-down on a flat level surface, so that the buttons stay in position until you 

are ready to remove them.

NOTE: Disconnect the power supply and all wiring connections before removing/

replacing buttons on the keypad.
NOTE: Before touching the device, discharge the static electricity from your body by 

touching a grounded metal object.

4.

The faceplate is attached to the mounting plate via four plastic tabs (two on each 

side of the faceplate). To remove the faceplate, gently pry it from either side.

FIG. 1  

LOCATION OF THE PLASTIC TABS ON THE MET-13E

5.

Gently lift each button off of their mounting posts on the circuit board.

6.

Select the location of the custom buttons and gently snap them into place on the 

circuit board. Be sure to note the orientation of the LED window on each button, 

to avoid accidentally mounting them upside down.

7.

Reattach the plastic faceplate.

Mounting Options

Mounts onto standard single gang US or EU back boxes.

• Each type of back box must adhere to its own specific safety approvals.
• Minimum internal clearance of (HWD) 2 5/8" x 1 3/4" x 1 5/8" (66.68mm x 

44.45mm x 41.28mm)

NOTE: Before touching the device, discharge the static electricity from your body by 

touching a grounded metal object.

Wallbox Mounting

1.

Use the cutout dimension for the wallbox to cutout the install surface.

2.

Connect category cable to the LAN port on the rear of the keypad.

3.

Place the Mounting Plate on the wallbox; align the screw holes with the mounting 

holes and fasten the Mounting Plate to the wallbox using the supplied screws.

NOTE: Do not overtighten the screws when mounting the Mounting Plate. The device 

should be flush with mounting surface.

Daisy-Chaining Keypads

You can use the MET-13E as an individual keypad or in conjunction with the MET-7X or 

MET-13X Metreau Ethernet Expansion Keypads. The Expansion Keypads connect to the 

MET-13E via the 16-conductor ribbon cable included with the expansion keypad.
Metreau keypads support daisy-chaining up to 3 keypads together. Daisy-chained 

keypads receive power from a single Ethernet connection and appear as a single 

NetLinx device.
Use the 16-conductor ribbon included with the expansion keypad to connect to the 

MET-13E (see FIG. 2).

FIG. 2  

DAISY-CHAIN CONNECTION BETWEEN THE MET-13E AND AN ETHERNET EXPANSION KEYPAD

NOTE: If you are installing a single expansion keypad into a 3-gang back box, install the 

expansion keypad in the space immediately adjacent to the primary Ethernet keypad (see 

FIG. 3). Daisy-chaining is supported across a distance of 4” (101.6 mm). 

FIG. 3  

INSTALL THE KEYPADS IMMEDIATELY ADJACENT TO EACH OTHER IN A 3-GANG BACK BOX

NOTE: When the ribbon cable is connected, touching or moving the ribbon cable can 

cause a temporary disruption in communication causing the keypads to temporarily go 

offline and return to service within 25-45 seconds of the initial break. Once the keypads 

are mounted and the ribbon cable is stable, no disruptions should occur.

Configuration

The following sections provide instructions on accessing and configuring the keypad.

Locating the IP Address of the Keypad

The MET-13E is configured for DHCP addressing by default. The keypad uses link local 

addressing as a backup in case the DHCP server is inaccessible. See the 

Toggling 

Between IP Address Modes: DHCP and Static IP

 section for information on setting a 

static IP address. Verify there is an active LAN connection on the controller’s LAN port 

before beginning this procedure.
1.

Using category cable, connect the LAN port on the keypad to your external 

network.

2.

In NetLinx Studio, select the OnLine Tree tab. You should see the MET-13E listed 

among the Unbound Devices.

3.

Right-click the MET-13E and select 

Network Bind/Unbind Device

 from the menu 

that appears. The Bind/Unbind Device dialog opens.

4.

By default, the selected keypad appears in the Device to Bind/Unbind menu at the 

top of the dialog. If there is more than one Unbound device in the system, click 

the down arrow to select which device you want to bind.

Plastic tabs

Connect ribbon cable here

Primary keypad

Expansion keypad