ALIGNMENT PROCEDURES
1. Equipment Required
• AM Standard Signal Generator (AM SSG.)
• Audio Generator
• Oscilloscope
• Distortion Meter
• AC Voltmeter
• DC Voltmeter
• FM Standard Signal Generator(FM SSG.)
• Frequency Counter
• Stereo Modulator
Note
: Remove FM external antenna from terminal when aligning.
2.
Alignment and Test Points
• Refer to Adjustment Location on page 12
Note
: As a front-end (FE 101) is difficult to repair if faulty, replace it with new one.
16
Содержание TU-940
Страница 7: ...7...
Страница 8: ...DISASSEMBLY PROCEDURES 8...
Страница 9: ...9...
Страница 10: ...10...
Страница 11: ...11...
Страница 12: ...12...
Страница 13: ...13 CIRCUIT DESCRIPTION 1...
Страница 14: ...14 2...
Страница 21: ...21 EXPLODED VIEW...
Страница 22: ...22...
Страница 23: ...PRINTED CIRCUIT BOARD MAIN 23...
Страница 32: ...32...
Страница 33: ...33...
Страница 34: ...34...
Страница 35: ...35...
Страница 36: ...36...
Страница 37: ...37...