7
3. When finishing the installation of first two arches, connect the Connection purlin
between two arches by using screw M8x70
(
No. 13. There is 4 pieces of Connection
purlins (part code 6)and 1 piece of Top roof purlin (part code 5) between each arch.
Then install the third arch into base plate and connect the purlin. By turns the
assembly for the frame is finished.
C--INSTRUCTION FOR COVERATTACHED
(C2020)
Содержание C2020
Страница 1: ...SHELTER ASSEMBLYMANUAL Container Shelter Model C2020 W6mx L6mx H2m Model C2040 W6mxL12mxH2m...
Страница 6: ...5 A B C D E F 3 Insert the Plastic Plug 30 50 mm No 12 into the ends of square tube No L1 L2...
Страница 9: ...8 C2040 Figure 3 C2020...
Страница 10: ...9 C2040 Figure 4 C2020...