background image

7

3. When finishing the installation of first two arches, connect the Connection purlin
between two arches by using screw M8x70

No. 13. There is 4 pieces of Connection

purlins (part code 6)and 1 piece of Top roof purlin (part code 5) between each arch.
Then install the third arch into base plate and connect the purlin. By turns the
assembly for the frame is finished.

C--INSTRUCTION FOR COVERATTACHED

(C2020)

Содержание C2020

Страница 1: ...SHELTER ASSEMBLYMANUAL Container Shelter Model C2020 W6mx L6mx H2m Model C2040 W6mxL12mxH2m...

Страница 2: ...e 10 18 5 Top roof purlin 4 8 6 Connection purlin 16 32 7 Lower tension tube for roof cover 2groups 2groups 7A Tie down ratchet 10 18 7B Band for Tie down ratchet 10 18 8 Angle iron 4 4 9 Roof cover 1...

Страница 3: ...bility to take of snow immediately if not slide off by itself READ ALL INSTRUCTIONS BEFORE ASSEMBLY 1 Keep work area clean Cluttered areas invite injuries Do not set up near snow drifts in slippery pl...

Страница 4: ...TOOLS FOR INSTALLATION 1 Measuring tape 2 String for alignment 3 Step ladder 4 Sledge hammer 5 Wrench 6 Scissors INSTALLATION PROCESS A BASE INSTALLATION Please refer to the diagram Figure 1 to place...

Страница 5: ...base plates ENSURE THAT THE FOUNDATIONS IS SQUARE 2 Fix the base plate No L1 L2 R1 and Connecting pieces No 15 by bolt No 16 according to Figure 1 Note The connector NO 15 please refer to NO A NO B t...

Страница 6: ...5 A B C D E F 3 Insert the Plastic Plug 30 50 mm No 12 into the ends of square tube No L1 L2...

Страница 7: ...and two pieces of Sidewall bent tubes No 4 To connect them by Screw M8x70mm No 13 Which makes one group of arch Please NOTE the direction of the screw DO NOT install the screws on the top of the truss...

Страница 8: ...rches by using screw M8x70 No 13 There is 4 pieces of Connection purlins part code 6 and 1 piece of Top roof purlin part code 5 between each arch Then install the third arch into base plate and connec...

Страница 9: ...8 C2040 Figure 3 C2020...

Страница 10: ...9 C2040 Figure 4 C2020...

Страница 11: ...Y CARFULLY AND SLOWLY on the frame Adjust the cover so that it is square and evenly centered on the frame 2 Weld the Angle seats No 8 on each container and use Rope No 11 to knit the cover on the two...

Страница 12: ...the final assembly and tightening has been completed The process is quite easy But some tightening adjustments will be necessary to produce a flat tensioned roof cover Please adjust the roof cover eve...

Отзывы: