
INSTALL THE SHIPPING BRACKETS
1. Power up the machine.
2. Move the Z axis to the following position on the Machine position register:
Machine Model
Position
Inches [Millimeters]
T-42 Lathe (16C Spindle)
8.800 [223.52]
T-42 Big-Bore Lathe (20C Spindle)
7.850 [199.39]
T-51 and T-65 Lathes
6.642 [168.70]
3. Power down the machine.
4. Release latch "J", Figure 2.8, and open the access doors.
5. Install carriage shipping bracket "V", Figure 2.41.
M-507C
2-29
Figure 2.41 - Carriage Shipping Bracket
V
TP7954
Содержание T-42
Страница 8: ... NOTES vi M 507C ...
Страница 50: ... NOTES 1 42 M 507C ...
Страница 84: ... NOTES 2 34 M 507C ...
Страница 86: ...Hardinge Inc Elmira New York 14902 1507 USA Phone 607 734 2281 Fax 607 734 8819 www hardinge com ...