![Hardinge Bridgeport EZ Vision Скачать руководство пользователя страница 66](http://html.mh-extra.com/html/hardinge/bridgeport-ez-vision/bridgeport-ez-vision_installation-maintenance-and-parts-manual_597296066.webp)
INSTALLATION PROCEDURES
MACHINES WITH R-8 SPINDLE
The manufacturer has drilled and tapped two holes in the nose cap of the spindle to be used for
mounting the guard (the two untapped holes serve to remove the nose cap with a spanner wrench).
1. Place mounting ring “B” underneath top of guard “D”, Figure 6.1.
2. Place two socket head cap screws “A” through the holes in ring, and hand-start them into the
threaded holes in the nose cap until hand tight.
3. Align guard to be square with the table of the machine, unless angular mounting is desired.
4. Tighten screws with a 3/16” Allen wrench.
6-2
M-477A
Figure 6.1 - Safety Guard for
Machines with an R-8 Spindle
TP5262
A
B
C
D
K
L
J
H
E
I
F G
Содержание Bridgeport EZ Vision
Страница 10: ... NOTES viii M 477A ...
Страница 18: ...HEAD DIMENSIONS 1 8 M 477A Figure 1 5 Head Dimensions TP5663 ...
Страница 20: ... NOTES 1 10 M 477A ...
Страница 36: ... NOTES 2 16 M 477A ...
Страница 44: ... NOTES 3 8 M 477A ...
Страница 58: ... NOTES 4 14 M 477A ...
Страница 64: ... NOTES 5 6 M 477A ...
Страница 70: ... NOTES 6 6 M 477A ...
Страница 71: ...CHAPTER 7 PARTS LISTINGS HEAD TOP HOUSING M 477A 7 1 TP5340 ...
Страница 74: ...HEAD BACK GEAR 7 4 M 477A TP5341 ...
Страница 78: ...HEAD LOWER HOUSING 7 8 M 477A TP5343 ...
Страница 84: ...BASIC MACHINE 7 14 M 477A TP5344 ...
Страница 96: ...OPERATOR PENDANT DC150 Motion Control System 7 26 M 477A TI5563 ...
Страница 97: ...POWER CASE EXTERNAL VIEW DC150 Motion Control System M 477A 7 27 TI5564 ...
Страница 98: ...POWER CASE INTERNAL VIEW DC150 Motion Control System 7 28 M 477A Revised March 28 2008 TI5565A ...
Страница 99: ...POWER CASE TERMINAL STRIPS DC150 Motion Control System M 477A 7 29 Revised March 28 2008 TI5566A ...
Страница 103: ... NOTES M 477A 7 33 ...
Страница 104: ......