6 - Maintenance
96
Cone Check/Renewal for Pressure Regulation Valve
If it becomes difficult to build up sufficient pressure or if pressure
fluctuations occur, it may be necessary to renew cone and cylinder.
1.
Remove 4 screws (A) and remove the housing.
2.
Remove 4 screws (B).
3.
Replace cylinder (C) and O-ring (D).
4.
Loosen the nut (E), remove and replace the cone (F).
5.
Reassemble in reverse order.
Cone Check/Renewal for EVC Distribution Valve
Periodically check the distribution valves for proper sealing. Do this by
running the sprayer with clean water and open all distribution valves.
Cautiously remove the clip (A) and pull out the hose (B) for the return
line. When the housing is drained, there should be no liquid flow
through the return line.
If there is any leakage, the valve cone (E) must be changed.
1.
Remove the clip (C)
2.
Lift the motor housing off the valve housing.
3.
Unscrew the screw (D) and replace the valve cone (E).
4.
Reassemble in reverse order.
μ
ATTENTION! Follow this procedure if you are having problems
maintaining the chosen application rate.
Содержание NK MB Series
Страница 1: ...NK SB MB Original Instruction book 67007200 110 version 1 10 GB 12 2015 www hardi international com ...
Страница 8: ...1 Identification 8 ...
Страница 52: ...3 Description 52 ...
Страница 62: ...4 Sprayer Setup 62 ...
Страница 84: ...5 Operation 84 ...
Страница 87: ...6 Maintenance 87 Boom Lubrication Oiling Plan Lift Lubrication Oiling Plan ...
Страница 109: ...8 Technical Specifications 109 Pump Specifications Pump Model 603 7 0 Pump Model 1203 9 0 Pump Model 1303 9 0 ...
Страница 116: ...9 EC Declaration 116 ...
Страница 120: ...Index 120 ...
Страница 122: ...HARDI INTERNATIONAL A S Helgeshøj Allé 38 DK 2630 Taastrup DENMARK ...