8
GB 05 01 02
MARRO set-up
MARRO set-up
MARRO set-up
MARRO set-up
MARRO set-up
WARNING!
Note these recommendations:
1. Add front tank to the tractor before mounting the
MARRO lift.
2. Adjust tyre pressure (see tractor’s instruction book)
3. Be careful when filling/lifting the sprayer for the first
time
4. Ensure that the operating unit and the tractor do not
touch
Front tank
T021-0020x
T021-0021x
Connecting the fr
Connecting the fr
Connecting the fr
Connecting the fr
Connecting the front tank
ont tank
ont tank
ont tank
ont tank
Tractor with front lift
Quick hitch 3-point linkage frame (ref. no. 732319) must
be mounted to the front tank; fasten it by two bolts
(M16 x 55).
Standard = cat. II wide. If conversion to cat. III is neces-
sary, please see the part “Connecting the MARRO lift”
for further information.
Fit the two reinforcement mountings on the linkage
frame as shown on
the drawing. Fasten
each with two bolts
(M16 x 50).
Tractor without front lift
A base plate for hook-on attachment (ref. no. 161594)
must be used as interface between tractor and front
tank.
This plate needs to be welded to two longitudinal bear-
ers, which subsequently can be bolted to each side of
the tractor.
NOTE!
The two longitudinal bearers should be extended
as far as possible towards the rear axle of the tractor.
It is strongly recommended to leave this job to your
tractor dealer, who is familiar with tractor manufacturing
recommendations.
To connect the front tank:
1. Lift the front tank, e.g. by a small crane, and lower it
onto the mounting, fastened on the tractor. The two
jags A on the tank frame must catch hold on the
mounting as shown on the drawing.
2. Secure the set up by two bolts ( M16 x 55).
T021-0022x
A
T021-0023
Содержание MARRO TWIN FORCE 1000
Страница 2: ...2 ...