background image

6

020-056-UK

HARDI HC5500 w/ JobCom  

SYSTEM CHECK

Please refer to the MATRIX Quick Guide and the Hardi HC5500 user manual.
To check the system it's necessary to have full GPS signal so the vehicle must be placed 

outside.
Connect all cables before starting the MATRIX and the HARDI HC5500 controller.

MATRIX

•  Encode number of sections and working width.
•  Encode antenna 'Direction', 'Offset' and 'Hight'
•  Encode 'Overlap' 
•  Encode 'Delay-start' and 'Delay-stop' 
•  Select AUTO in the 'Work-screen' (Press the green triangle)

HARDI HC5500

•  For general setup, refer to the HARDI manual
•  In the 'Data exchange' menu Set COM-2 to 'VRA/Remote Control' and 

baud rate = 9600.

•  Turn the master switch and the section switch's ON.
•  Drive forward (Min. 1.5 kmh), check that all section valves open.
•  Check that all sections shows 'ON' in the Matrix display.
•  Check that all sections shows 'ON' in manual mode (Red triangle). 

Содержание HC5500

Страница 1: ...BOOMPILOT INSTALL ATION MANUAL HARDI HC5500 w JobCom ...

Страница 2: ...Disturbance to from any electronic services or products that do not confirm to the standards for CE marking Missing or poor signal coverage or a succession hereof from external transmitters receivers used by the buyer Functional faults which apply to or from a PC program or PC equipment not delivered by the seller Faults that may arise from the buyers negligence to react to warnings and fault mess...

Страница 3: ...e sprayer in manual mode The operator is always able to override the control of the sprayer via the master switch on the HARDI SPRAYER II switch box HARDI HC5500 W JOBCOM Features The Matrix in combination with the Hardi smartcable for HC5500 w jobCom adds Automatic Boom Section Control to the sprayer Software version The HARDI HC5500 and the MATRIX communicates via a special RS232 to CAN device T...

Страница 4: ...4 020 056 UK HARDI HC5500 w JobCom SYSTEM DIAGRAM MATRIX 570 Matrix PRO 570 HC 5500 Spray II A B CAN Term RS232 SMART CABLE POWER To JobCom Power A B C D ...

Страница 5: ...e Controller Kit 1 B 45 05826 Power CAN Data Cable w COBO connector 1 C 78 05096 SmartCable HARDI HC5500 1 D 45 08101 CAN Termination male 4p WP 1 Part number is dependent on kit contents INSTALLING THE HARDI HC5500 SMARTCABLE Connect the Smartcable C and CANBUS termination D as shown on the system diagram Connecting to Power Pos Description 1 12V 15 30 2 Ground 31 Connect the Smartcable to COM 2 ...

Страница 6: ...s and working width Encode antenna Direction Offset and Hight Encode Overlap Encode Delay start and Delay stop Select AUTO in the Work screen Press the green triangle HARDI HC5500 For general setup refer to the HARDI manual In the Data exchange menu Set COM 2 to VRA Remote Control and baud rate 9600 Turn the master switch and the section switch s ON Drive forward Min 1 5 kmh check that all section...

Страница 7: ...7 020 056 UK HARDI HC5500 w JobCom ...

Страница 8: ...BOOMPILOT INSTALL ATION MANUAL 020 056 UK R1 TeeJet Technologies 2013 ...

Отзывы: