Page 9
For technical questions, please call 1-888-866-5797.
Item 56385
S
AF
e
T
y
O
P
e
RA
T
iO
n
M
A
in
T
en
A
n
C
e
Se
T
u
P
8. Connect three Power Cables (Control Box
Relocation Kit) to the Extended Copper
Screws on motor terminal using three of the
Motor Terminal Nuts removed in step 4.
Motor
Terminal
nuts
Power
Cables
9. Install the Terminal Box Cover on the Terminal
Box using three M4.8 x16 Self-Tapping
Screws. Do not overtighten screws.
Terminal
Box
M4.8 x 16
Screw
Terminal
Box Cover
10. Connect three Power Cables (control box
relocation kit) to the Control Box using remaining
three Motor Terminal Nuts removed in step 4.
Motor
Terminal
nuts
Control
Box
black
red
yellow
11. Use the Small Black Wire Connector and
Small Black Wire Extension to lengthen
the Small Black Wire from the Control Box.
Reconnect the Ground Cable and Small Black
Wire to the backside of the Winch motor.
Small Black
Wire extension
Connector
Black
Ground
Cable
Red
Battery
Cable
12.
Install the four decorative M6 x12
Screws onto the Winch.
M6 x 12
Screw
13. Place the Control Box on a solid mounting
surface in a suitable place near enough to the
Winch to allow the cables to be routed properly.
14. Verify that the installation surface has no
hidden components or structural pieces
that will be damaged before drilling.
15. Secure the Control Box assembly in place
with Baseplate mounting hardware.