background image

Page 7

SKU 93920

For technical questions, please call 1-800-444-3353.

(44) up under the rail and over the end of the Bolt (59), then 

2)

 secure it using a Nut 

(61).  Use two Hold Down Connectors for each Corner Stud.

Remove the Nuts (61) you used in step 1 to assemble the Side Floor Plates (18a, 

3. 

18b), install a Hold Down Connector (44) over the end of each Bolt (59), and rein-
stall all Nuts (61).

4. 

Place three Short Bolts (59) and Nuts (61) into the holes on the Top Doorway Beam 
(14).  Do not tighten them yet.  While making sure that the profiles of the parts are 
oriented as shown to the right, slide the slot on the Door Rail (28) 
over  the  heads  of  the  three  bolts  on  the Top  Doorway  Beam.   
Center  the  Door  Rail  on  the  Doorway  Beam  then  tighten  the 
Nuts.
Attach a Corner End Cap (68) to the top outer corner of each Corner Stud (1).

5. 

(Fr

ont)

(Rear)

(Right)

Figure A

20a

(left)

16

18a

18b

18b

18a

1

1

1

1

20a

20a

20b

20b

26

26

26

26

17

23

the 14 spots requiring a Hold-
down  connector  (44)  are 
marked  with  a  plus 
(+).

+

+

+++

+++

++

+

+

+

+

6. 

Assemble both Side Ceiling Plates (20a, 20b) to one an-
other.
Attach a Side Ceiling Plate Ass’y (20) flat against the 

7. 

inside 

of two Corner Studs (1).  Make sure that the gutter on the 
Side Ceiling Plate is oriented correctly, see 

Figure A 

inset

.  

28

14

Содержание 93920

Страница 1: ...ved No portion of this manual or any artwork contained herein may be reproduced in any shape or form without the express written consent of Harbor Freight Tools Diagrams within this manual may not be...

Страница 2: ...nd Braces 9 Assembling the Roof Studs and Braces 12 Assembling the Window 13 Assembling the Doors 13 Installing the Transparent Panels 15 Panel Installation Diagram 16 INSPECTION MAINTENANCE AND CLEAN...

Страница 3: ...t Although this greenhouse does include some protective covers there are still some exposed sharp edges In addition protective covers may fall off in time Children must be supervised if allowed near t...

Страница 4: ...sure there is adequate surrounding workspace Avoid high traffic areas Always keep the work area free of obstructions grease oil trash and other debris PROPER GREENHOUSE LOCATION 13 Make sure the Gree...

Страница 5: ...se should not open towards the prevailing wind if possible Excavate an area for the base of the greenhouse The area must be 8 2 wide by 1 10 2 long by 21 2 23 4 deep The floor of the hole must be leve...

Страница 6: ...y damage the Greenhouse and will make assembly difficult Front Floor Plate 17 ground outside greenhouse Base 40 Gravel Rear Side Floor Plates 16 18a 18b ground outside greenhouse Base 40 41a 41b Grave...

Страница 7: ...profiles of the parts are oriented as shown to the right slide the slot on the Door Rail 28 over the heads of the three bolts on the Top Doorway Beam Center the Door Rail on the Doorway Beam then tigh...

Страница 8: ...he Rear Floor Plate 16 Attach each end to the lower hole on the Corner Bracket 26 using a Long Bolt 60 and Nut 61 See Figure A Assembling the Roof Frame 28 14 13 39 3 2 5 4 15b 15a Figure B 1 At the s...

Страница 9: ...ft the Crown Assembly and place the Crown Beams 2 5 on 8 top of the Corner Brackets 26 See Figure B Secure each corner in place with the Crown Beams on the outside of the Corner Brackets Assembling th...

Страница 10: ...Down Connector 44 under the base and over the Bolt before installing the Nut 61 at each bottom connection Attach a Side Diagonal Brace 22 to the lower hole of a Corner Stud 1 on the 5 inside with the...

Страница 11: ...ng Bolts 60 Connect the loose ends of the Front Braces 21 to the Doorway Studs 6 7 using Long Bolts 60 See Figure C 11 Attach the Door Slide Support 19 to the Front Right Crown Beam 2 using the Long D...

Страница 12: ...asterisk 2 above Slide two Long Bolts 60 into the Roof Studs indicated with a caret above Slide one Long Bolt 60 into all the Roof Studs not marked with a caret above Secure the ends of all Roof Stud...

Страница 13: ...at 6 the top of the Crown 15b see illustration to the right The win dow should be aligned with the Window Brace 38 underneath it Slide the window into place over the Window Support Beam 36 Gradually l...

Страница 14: ...the Sliders are assembled the correct way with the gap facing the back of the door see diagram to the right Attach the Bottom Door Frame 32 to the Outer Inner Door Frames 27a 27b using two Screws 57...

Страница 15: ...ne at a time place each Transparent Panel 47 49 51 55 in its proper location 4 on the Ceiling and Frame of the Greenhouse Then secure the Transparent Panel in place using the quantity and location of...

Страница 16: ...6 SKU 93920 For technical questions please call 1 800 444 3353 Panel Installation Diagram 47 47 47 47 47 48 48 48 48 50 51 51 50 48 48 48 48 49 49 52 52 49 49 55 55 55 55 53 53 54 54 Panel Clip 67 Loc...

Страница 17: ...Greenhouse in a box and in a clean dry location PLEASE READ THE FOLLOWING CAREFULLY THE MANUFACTURER AND OR DISTRIBUTOR HAS PROVIDED THE PARTS DIAGRAM IN THIS MANUAL AS A REFERENCETOOL ONLY NEITHERTH...

Страница 18: ...15a Front Crown 5 2 1 15b Rear Crown 4 10 1 16 Rear Floor Plate 7 9 1 17 Front Floor Plate 7 9 1 18a Side Floor Plate A 4 10 2 18b Side Floor Plate B 5 2 2 19 Door Slide Support 1 2 2 Part Descriptio...

Страница 19: ...nel 1 11 x 3 2 51 Window Pane 1 11 x 1 9 2 52 Rear Center Panel 1 11 x 6 8 2 53 Door Center Panel 2 x 9 2 54 Front Top Panel 1 11 x 1 4 2 Part Description Q ty 55 Door Top Bottom Panel 2 x 1 11 4 56 L...

Отзывы: