
49
2.
Push UP/DOWN button to move unit down and push FEED button to feed sequin
3.
Turn main shaft up to the position that needle tip reaches near to sequin hole (around 278
degrees)
Caution
: When turning main shaft, please watch needle. As needle bar push down
gauge is set on needle bar, needle or needle clamp might hit to other parts.
4.
Turn slider screw and set needle position as below drawing
※Please set needle position to front side from sequin hole center
55449B53D9?>
%554<5
Trim position
+
+ '
'
&
&-
-
Содержание HCR2
Страница 1: ...SEQUIN DEVICE INSTALLATION MANUAL HCR2 HCR3 HappyJapan Inc Ver 2 1 For qualified personal only ...
Страница 19: ...19 9 Pull sequin unit up ...
Страница 28: ...28 3 Set lock as below and return reel bar to original position 3 C9D9 ...
Страница 37: ...37 pj Left Right 5D L M 9D38 2 3 69H9 7 C3B5G 554 2I F5 5 D 6 6554 9 9H9 7 C3B5G 8 5 ...