S
O
S
O
C
G
K
P
K
P
D
W
O
O
O
D
Z
Z
S
O
P
K
W
Z
O
Z
E
with the M5 allen key(O) and the spanner(P).
To attach the Baton (B1)TO the footboard(F) you will need to use hardware parts
2x
(L)
.
M8x45mm Bolts
wıth
the M5 allen key(O)
O
O
O
A1
L
A1
K
K
K
P
P
P
O
O L
B1
Step 6
DO NOT use any power tools, this may damage the bed frame and will invalidate any claims.
To attach the front frame rail(W)and back frame rail
(
W
)to the left frame rail (
D
)and right frame rail(
D
),
you will need hardware parts 4 X
(Z) with the M5 allen key(O).
M8x16mm Bolts
To attach the centre support bar
(
C
) to the front frame rail(
W
)and back frame rail(
W
),you will need hardware
parts 4X
(S) and 4X
(K) with the M5 allen key(O
)
and the spanner(P).
M8x40mm Bolts
Nuts
To attach the support leg
(
G
) to the centre support bar(
C
),you will need hardware parts
2X
(S)
M8x40mm Bolts
and
2X
(K)
with
the M5 allen key(O) and the spanner(P).
Nuts
Insert the metal hook(E) to the front frame rail(W).
Page 7 of 8
To attach the metal frame(W/C/D) and cross support bar(X)to the gas lift pre-fixed to the side rails,
you will need to use hardware parts 4X
(L)
and 6x
(K)
M8x65mm Bolts
(A1)
,
2 X
M8x45mm Bolts
Nuts
X
X
Step 7