![Hansol Scalable All In One ELSR103-00001 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/hansol/scalable-all-in-one-elsr103-00001/scalable-all-in-one-elsr103-00001_installation-manual_595110039.webp)
5. Electrical Connections
31
Screwing Torque = 1.4 Nm
3.
When docking the battery, make sure not to leave space with main body. After docking
the battery, fasten the screws to fix the tray and the body. Make sure to have two
persons lift the battery tray.
Use a torque screwdriver of 1.4 – 1.6 Nm to tighten the screws on the battery tray.
[Figure 5-8: Battery Docking description]
5.4.2 Scalable (From 7.2 kWh to 10.8 kWh)
CAUTION
When it is scalable from 7.2 kWh to 10.8 kWh, the system is maintained
with the battery life (SOH, EOL) for 7.2 kWh.
It means that the system guarantees the battery life for 7.2 kWh.
When it is scalable to 10.8 kWh, the battery life is guaranteed for 7.2 kWh.
NOTE
When it is scalable from 7.2 kWh to 10.8 kWh, contact the installer.
1.
Unfasten 6 side cover bolts.
[Figure 5-9: Unfastening screws]