
Materials required for assembly
Page EN-14
Materials required for assembly
Parts list
(1) Exhaust hood with glass hood
(2) 8 mounting rails
(3) Flue screen, upper section
(4) Flue screen, lower section
(5) Exhaust air hose
(6) Base plate for ceiling mounting
(7) 4 screws 8 mm, ø 4 mm
(8) 42 screws 10 mm, ø 4 mm
(9) 26 nuts M4
(10) 26 washers M4
(11) 2 cable ties
(12) Mounting hook (for securing the raised
flue screen 4 into a mounting rail 2, e.g.
during cleaning / maintenance work)
(13) 2 plastic check valves
(without illustration)
Mounting material
The screws and dowels required to
mount the appliance on a ceiling are
not included in the package contents, as
their type and dimensions will vary depend-
ing on the characteristics of the ceiling.
Please have a specialist advise you as to
which ones you need.
You will need 12 wall plugs and screws or
heavy duty anchors (14) - (16).
Tools and aids
You will need:
– Cross-head screwdriver, size 2
– Drill with ø 10 mm drill bits suitable for the
ceiling
– Measuring tape / ruler
– Level
– Plumb line
– Pencil
– Stable stepladder
– Activated carbon filter for circulation air
operation
We also recommend having a second person
with you to help.
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
(14)
(15)
(16)