
6
Installation of fittings jumper see page 30
Installation of basic set see page 32
Note:
Read the installation instructions prior to
installation. These contain important information
for the safe and proper installation.
Installation
All work on the RainBrain may only be carried out
in a de-energized state!
All components must remain accessible.
Wear safety clothing during the installation.
Risk of fire - installation box
There must not be any flammable materials present
in the immediate vicinity.
The ambient temperature must not exceed
50 °C.
Electrical fitter
All installation and inspection works must be carried
out by an approved electrician and in accordance
with VDE 0100 Part 701 and IEC 60364-7-701.
Electrical connection
Mains supply 230V/N/PE/50Hz (3x1.5mm²
length 0.5m). For electrical installation, all appli-
cable VDE, country-specific and EVU regulations in
their respectively valid versions must be observed.
The potential equalisation must be provided by the
site (4mm², Cable length 1m).
Leakage current protection device
The fusing must be conducted via a leakage cur-
rent protection device (RCD/FI) with a measuring
differential power of 30 mA.
Fasteners
Only use the proper fasteners! The included screws
and dowels are only intended for concrete.
Rinsing see page 31, Figure 5
Rinse the entire installation as per
DIN1988 / EN1717.
Drain capacity
The drain capacity must be at least 50 l/min.
Installation of basic set display page 32:
Figure 8:
Plaster in the basic set display, or install wall cove-
ring if installed in front of wall.
Figure 9:
After the plastered wall surface has dried, spray
the seam between the wall and the plastic casingn
with silicone (free of acetic acid!).
Figure 10:
Coat the wall with PCI-Lastogum or a compa-
rable sealing compound as instructed by the
manufacturer.
Figure 11:
Place the sealing collar over the plastic casing and
press it into the glue and the silicone.
The sealing collar (
F page 24
) must
not be hot-glued.
Repair
Only by Hansgrohe trained personnel or persons
or companies appointed by Hansgrohe.
Prelock
Consumers 1 - 5
English
Specifications
Specifications
Operating pressure:
max. 1 MPa
Recommended operating
pressure:0.2 - 0.5 MPa
Test pressure:
1.6 MPa
(1 MPa = 10 bar = 147 PSI)
Hot water temperature:
max. 80° C
Recommended hot water temperature: 65° C
Fitting dimensions:
G ¾
Fittings:
cold on the right
warm on the left
Rate of flow by 0,3 MPa:
42,5 l/min
Note:
The terminal block must be installed
horizontally (Hansgrohe scribe must be legible).
Supply lines from below.
Routing zones of electrical sys-
tems as per VDE0100 Part 701
Layout and cable routing, see page 28
When calculating the accumulator size and the
drain, you must consider that up to 42,5 litres/min
may be required for 0.4 MPa mixing water - depen-
ding on which showers will be combined.
Warning
hazardous electrical voltage
Attention!
Must be adhered to!
NOTE
Indicates information, whose content
is important and must be observed.
Electrical fitter
Installation tool/installation
sequence
Dimensions (Page 24)
Installation dimensions
(Page 25)
Specifications (Page 6)
Installation diagrams
(Page 26-29)
Содержание RainBrain 15840180
Страница 25: ...25 max 10 000 min 1m Ø 4 mm 1 5 G3 4 D E G3 4 G3 4 1 2 3 1 2 3 ...
Страница 26: ...26 A 5 4 3 2 1 ...
Страница 27: ...27 B C ...
Страница 29: ...29 600 4 5 Raindance Rainfall 1 2 3 ...
Страница 30: ...30 G G 650 2 1 max 1 MPa ...
Страница 31: ...31 3 4 2 3 5 6 2 1 1 SW 24 mm SW12 mm SW12 mm 5Nm SW12 mm SW 24 mm ...
Страница 32: ...32 8 7 1 2 SW12 mm 5Nm EN25 EN20 ...
Страница 35: ...35 ...