Hanover 9820001-1 Скачать руководство пользователя страница 5

Содержание 9820001-1

Страница 1: ...rden Shed OWNER S MANUAL Instructions for Assembly Requires two people and takes 2 3 hours for lnstallation Quick Easy Assembly Ridge Reinforced Walls 1 Metal Garden Shed OWNER S MANUAL Instructions f...

Страница 2: ...the fasteners and the tools 2 BEFORE YOU START Owner s Manual Prior to installation it is important that you contact your local government authority to determine if building approval is required Study...

Страница 3: ...22 4 23 1 1728mm 68 03 35 36 37 1 4 2 1 882mm 34 72 1728mm 68 03 7R 1 4 2 2 13 14L 14R 1728mm 68 03 248mm 9 76 2 26 1580mm 62 2 1 1360mm 53 54 27 1 677mm 26 65 1 29L 29R 3 34 2 33 1614mm 63 54 24 2 51...

Страница 4: ...14 09 P7 1 PART NO Qty D2 1 D1 1 P11 P12 P13 1 1 1 1642mm64 64 P14 1 4 P10 6 458mm 18 03 P16 1 P17 1 P18 1 PART NO Qty P15 1 598mm 23 54 W1 W2 W3 W4 796mm 31 33 1335mm 52 55 2 2 4 3 925mm 36 41 W5 40...

Страница 5: ...P9 P9 P1 P1 P1 P1 22 13 13 18 18 D2 D1 1 9 22 36 1 23 13 20 35 P2 P2 P2 P2 P2 P2 P2 P2 22 22 13 2 21L 21R 14R 14L 16 12 12 14R 14L 21R 21L 29R 29L 34 26 26 27 W5 W5 W5 W5 W4 W4 S4 S4 LEFT EXTENSION P...

Страница 6: ...6 8 8 8 8 32 32 25L 25R 38 38 24 28 GC GC GC GC GS GS 10 30 30 P17 P15 P16 P18 P10 P10 P10 P10 P10 P10 34 34 9 31 24 W4 38 38...

Страница 7: ...B F1x 12 3Lx 1 3Rx 1 5 x 1 1 x 2 2 x 1 B B c c D D c 1 2 3R 5 3L D 1 7 Base Assembly...

Страница 8: ...1 When diagonal measurements are equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly 5 3R 3L 1 1 2 8 Base Assembly Inspection...

Страница 9: ...9 F4x 7 S3 x 7 4R x 1 13x 1 P9 x1 P1 x1 F1 F1 4R 3R 4R 13 P9 P1 Pay attention to dumping Need a person or a shelf to support Wall Panels Installation Install the parts according below order 4R 13 P9 P...

Страница 10: ...10 F1x 4 S3 x 4 22x1 P1 22 F1 22 13 13 x 1 Pay attention to dumping Need a person or a shelf to support...

Страница 11: ...11 F1x 8 S3 x 8 22x1 P2 22 23 P2 23x 1 P2 x 2 Pay attention to dumping Need a person or a shelf to support...

Страница 12: ...12 F1x 8 S3 x 8 13x 1 P1 x1 22x 2 P1 13 22 22 Pay attention to dumping Need a person or a shelf to support Pay attention to dumping Need a person or a shelf to support...

Страница 13: ...13 F1x 13 S3 x 13 13x1 P1 x1 9 P1 P1 9 9 x1 13 P9 4L 4Lx 1 P9 x1 Pay attention to dumping Need a person or a shelf to support F1 F1...

Страница 14: ...14 F1x 96 S3 x 96 P1 x 5 9 P1 P9 P9 P1 P1 P1 P1 P2 P2 P2 P2 P2 P2 P2 x 6 P9 x 6 P1 9 P9 P9 P9 P9 9 x1 Pay attention to dumping Need a person or a shelf to support F4 F4...

Страница 15: ...15 21L x 2 21Rx 2 14L x 2 14R x 2 F2x 12 GF x 4 12 x 2 x2 x2 21L 21R 14L 14R GF GF 12 12 B3 21L...

Страница 16: ...Back Triangle Panel Installation 16 S3 x 8 F1x 8 9 20 x2 20 x 1 20...

Страница 17: ...17 S3 x 10 F1x 10 G2 x4 7L x1 7R x1 7R 7L 7L 7R 6 9 7R x2 6 7L 7R 4R 21L 21R 6 x 1 G2 x2 7L 7R Front Trigangle Panel Installation...

Страница 18: ...16 x 1 16 16 F2 12 F2 12 F2x 2 18 Crossbeam Installation...

Страница 19: ...19 13 36 F1 4L 37 23 35 4R 37 35x 1 36x 4 37x 2 F1x 35 S3 x 35 F1 F1 F1...

Страница 20: ...20 34 29R 34 29L 29R W5 W5 W5 W5 W4 S4 S4 W4 29R W5 W4 W4 S4 F1 F1x 8 W4 x 2 W5 x 4 S4 x 2 34x 1 29Lx 1 29Rx 1 Base of Left Storage Assembly...

Страница 21: ...21 F1x 6 S3 x 6 26 26 27 27x 1 26 x 2 Frame of Left Storage Assembly...

Страница 22: ...22 F1x 4 S3 x 4 x2 Connection between L Storage Main body of the Shed...

Страница 23: ...P11 P7 P4 P5 P7 P4 P6 P14 P11 P12 P13 P4 P5 P6 P7 x1 P11 P12 P13 P14x1 Roof Panels Installation Corrugation edge of P11 Panel should Cover the edge of P14 panel Corrugation edge of P4 Panel should cov...

Страница 24: ...24 S3 x 4 F1x 10 17 x2 19x 1 F1 GE 17 19 17 17 17 33 33 19 33 x2 GE x 2 x2 Front Back eaves and Plastic cover installation...

Страница 25: ...25 10 10 GS GS 10 10 F1 10 17R 10x2 F1x12 S3x8 GCx4 GS x4 x2 10 10 Left Right eave water outlets plastic connectors installation...

Страница 26: ...26 B F1x 8 24 x 2 34x 2 B B B B W4 24 A A W4 x 1 A 24 24 34 34 W4 Base of right storage installation...

Страница 27: ...27 1 When diagonal measurements are equal the frame is square 2 The Floor Frame must be BOTH square AND level or the holes will not line up properly 24 24 34 34 W4 Finishing Inspection of the base...

Страница 28: ...8 P10x1 8 8 8 x 3 F1x7 28 S3 x 7 P10 Frame of right storage assembly...

Страница 29: ...P10 P10x 5 8 x1 F1x23 8 9 29 S3x23 P10 P10 9 x1 Frame of right storage assembly...

Страница 30: ...F1x8 S3 x 8 25L 25R 32 25L x 1 25R x 1 30 25L 25R 9 9 8 8 32 9 25L 9 25L F1 32 32 x 2 Triangle Panel Installation...

Страница 31: ...F1x16 8 38 F1 8 38 F1 38x 4 S3 x 16 31...

Страница 32: ...32 F1x 12 28x 1 S3 x 6 28 25R 28 13 F1 YOU NEED TO PUNCH BY YOURSELF HERE F1 F1 S4 S4 x 2 28 28 F1 Connection between right storage and main body of the shed...

Страница 33: ...26 S3 x 26 P18 P16 P15 P17 P15 P16 P17 P15 P17 P16 x 1 P17 x 1 P18 x 1 P15 x 1 Corrugation of P15 panel should cover the edge of P17 and that of P16 panel should cover P15 Roof of right storage insta...

Страница 34: ...10 x 1 F1x 4 30 x 2 GCx 4 34 31x 1 F1 10 30 GC 30 F1 31 P17 GC Eave and plastic connectors installation...

Страница 35: ...GB F2 D1 D2 18 18 18 F2 F2 F2 F1 18 18 F1 F2 F2 GB GD F2 18 x 6 D1 D2 x1 GBx 2 F1x 12 F2x 22 GDx 4 35 S3x 34 D1 D2 Door Assembly...

Страница 36: ...Door Installation F3 18 7 G2 F3x 8 36...

Страница 37: ...37 W1 x 2 W2 x 2 W3 x 4 F1x 2 W2 1 W3 W1 W1 W2 W1 1 W1 W2 W3 W3 W3 W3 1 1 2 W2 W1 3R 3L 5...

Отзывы: