background image

22 

• Press 

GLP/  

 

to edit the desired year (2000-2099). If the key is kept pressed, the year number 

is automatically increased. 

•  When the correct year has been set, press 

ZERO/CFM

 or 

READ   /TIMER

 to confirm. Now the 

display will show the month blinking.

• Press 

GLP/

  

 to edit the desired month (01-12). If the key is kept pressed, the month number 

is automatically increased.

or

Note: If the display shows “STD HIGH”, the standard value was too high. If the display 

shows “STD LOW”, the standard value was too low. Verify that both CAL Check

TM

 Standards 

HI96709-11 Cuvettes, A and B are free from fingerprints or dirt and that they are inserted 

correctly.

• Then the date of the last calibration (e.g.: ”01.08.2008”) appears on the display, or 

“01.01.2008” if the factory calibration was selected before. In both cases the year number is 
blinking, ready for date input. 

Date Input

CALIBRA

TION 

PROCEDURE

Содержание HI96709C

Страница 1: ...INSTRUCTION MANUAL HI96709C Manganese High Range ISM...

Страница 2: ...as a precise idea of its versatility If you need additional technical information do not hesitate to e mail us at tech hannainst com or view our worldwide contact list for a Hanna Instruments represen...

Страница 3: ...PLE OF OPERATION 6 FUNCTIONAL DESCRIPTION 7 ERRORS AND WARNINGS 9 GENERAL TIPS FOR AN ACCURATE MEASUREMENT 1 STARTUP 2 MEASUREMENT PROCEDURE 2 VALIDATION PROCEDURE 5 CALIBRATION PROCEDURE 7 GLP 0 BATT...

Страница 4: ...Meter is supplied complete with Sample Cuvettes and Caps 2 pcs CAL Check standard cuvettes 9V Battery Scissors Cloth for wiping cuvettes Instrument Quality Certificate Instruction Manual and Quick Ref...

Страница 5: ...field applications Display messages aid the user in routine operation The meter has an auto shut off feature that will turn off the instrument after 10 minutes of non use in measurement mode or after...

Страница 6: ...ion 0 1 mg L Accuracy 25 C 77 F 0 2 mg L 3 of reading Light Source Tungsten lamp Light Detector Silicon Photocell with narrow band interference filter 525 nm Method Adaptation of Standards Methods for...

Страница 7: ...entration of the substance d optical path through the substance Therefore the concentration c can be calculated from the absorbance of the substance as the other factors are known Photometric chemical...

Страница 8: ...ment process is carried out in two phases first the meter is zeroed and then the actual measurement is performed The cuvette has a very important role because it is an optical element and thus require...

Страница 9: ...to confirm factory calibration restore READ TIMER this is a multi functional key In measurement mode press to make a measurement or press and hold for three seconds to start a pre programmed countdown...

Страница 10: ...actory calibration DISPLAY ELEMENTS DESCRIPTION 1 The measuring scheme lamp cuvette detector appears during different phases of zero or reading measurement 2 Error messages and warnings 3 The battery...

Страница 11: ...zero cuvette are inverted Zero A zero reading was not taken Follow the instructions of the measurement procedure for zeroing the meter The instrument shows clear messages when erroneous condition app...

Страница 12: ...is higher than expected Cap error Appears when external light enters in the analysis cell Assure that the cuvette cap is present Cooling lamp The instrument waits for the lamp to cool down Battery low...

Страница 13: ...For a correct filling of the cuvette the liquid in the cuvette forms a concavity on the top the bottom of this concavity must be at the same level of the 10 mL mark Proper use of the powder reagent p...

Страница 14: ...the reaction times reported in this manual are at 25 C 77 F In general the reaction time should be increased for temperatures lower than 20 C 68 F and decreased for temperatures higher than 25 C 77 F...

Страница 15: ...UREMENT PROCEDURE When the beeper sounds briefly and the LCD displays dashes the meter is ready The blinking ZERO indicates that the instrument needs to be zeroed first Fill the cuvette with 10 mL of...

Страница 16: ...709A 0 Manganese HR Reagent A replace the cap and shake gently the cuvette for 2 minutes In the same cuvette add the content of one packet of HI93709B 0 Manganese HR Reagent B replace the cap and shak...

Страница 17: ...e and 30 seconds then just press READ TIMER In both cases the lamp cuvette and detector icons will appear on the display depending on the measurement phase At the end of measurement the instrument dir...

Страница 18: ...he meter on by pressing ON OFF Press ZERO CFM and the lamp cuvette and detector icons will appear on the display depending on the measurement phase Place the CAL CheckTM Standard HI96709 11 Cuvette A...

Страница 19: ...ations please check that the cuvettes are free of fingerprints oil or dirt and repeat validation If results are still found out of specifications then recalibrate the instrument VALIDATION PROCEDURE A...

Страница 20: ...by pressing ON OFF When the beeper sounds briefly and the LCD displays dashes the meter is ready The blinking ZERO asks for instrument zeroing Press and hold CAL CHECK for three seconds to enter calib...

Страница 21: ...asks for reading calibration standard Remove the cuvette Place the CAL CheckTM Standard HI96709 11 Cuvette B into the cuvette holder and ensure that the notch on the cap is positioned securely into th...

Страница 22: ...automatically increased or Note If the display shows STD HIGH the standard value was too high If the display shows STD LOW the standard value was too low Verify that both CAL CheckTM Standards HI9670...

Страница 23: ...confirm Now the display will show the day blinking Press ZERO CFM to save the calibration date The instrument displays Stor for one second and the calibration is saved or Note It is possible to change...

Страница 24: ...er three seconds GLP LAST CALIBRATION DATE FACTORY CALIBRATION RESTORE To display the calibration date Press GLP to enter GLP mode The calibration month and day will appear on the main display and the...

Страница 25: ...50 measurements depending on the light level The remaining battery capacity is evaluated at the instrument startup and after each measurement The instrument displays a battery indicator with three lev...

Страница 26: ...ockwise to close To replace the instrument s battery follow the steps BATTERY REPLACEMENT ACCESORIES Reagent Set HI93709 01 Reagents for 100 tests HI93709 03 Reagents for 300 tests Other Accessories H...

Страница 27: ...ts prepaid When shipping any instrument make sure it is properly packaged for complete protection To validate your warranty fill out and return the enclosed warranty card within 14 days from the date...

Страница 28: ...ents Inc Highland Industrial Park 584 Park East Drive Woonsocket RI 02895 USA www hannainst com Local Office Hanna Instruments USA 270 George Washington Highway Smithfield RI 02917 Phone 800 426 6287...

Отзывы: