background image

-5-

This check list that follows is an important reminder of valuable information that should be passed
on to the customer at the time this Manure Spreader is delivered.

Check off each item as you explain it to the customer.

This delivery check list, when properly filled out and signed assures the customer that the
Pre-delivery service was satisfactorily performed.

Explain to the customer that the pre-delivery inspection was made.

Explain to the customer all the safety precautions they must excercise when operating

this unit.

Explain recommended loads for different types of materials.

Explain to customer that regular lubrication is required for proper operation and long life of

machine.

Show customer the lubrication section of Owner’s Manual.

Give the customer Owner’s Manual and make sure they read and understand all operating

and service instructions.

Have the customer sign a completed “Warranty Registration”, and mail it.

DEALER DELIVERY CHECK LIST

(Remove Dealer File Copy 

At Perforation)

AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS

Date Delivered

Dealer’s Name

By

Signature of Original Buyer

Note: Warranty is not valid until warranty card is completed and returned to H&S Mfg. Co., Inc.

Содержание 125 PTO

Страница 1: ...ER MANURE SPREADER MANURE SPREADER MANURE SPREADER MANURE SPREADER OPERA OPERA OPERA OPERA OPERAT T T T TOR S MANU OR S MANU OR S MANU OR S MANU OR S MANUAL AL AL AL AL Revision 01 Starting Serial 511550 HSMFG1014 Part 64237 READ AND UNDERSTAND THIS MANUAL BEFORE OPERATING THIS EQUIPMENT UNSAFE OPERATION OR MAINTENANCE OF THIS EQUIPMENT CAN RESULT IN SERIOUS INJURY OR DEATH ...

Страница 2: ... of Safety Signs 8 Safety Decals 9 10 Safety Information Warning Owner Must Read and Understand 11 Cap Screw Torque Values 12 Set Up Assembly 13 Transporting 13 Preparing for Opertation 14 Operation 15 Adjustments 16 Service 17 18 Optional Equipment 19 Lubrication Guide 20 21 Decal Location 22 24 Trouble Shooting 25 Service Notes 26 Specifications Inside Back Cover ...

Страница 3: ......

Страница 4: ......

Страница 5: ... properly DEALER PRE DELIVERY CHECK LIST AFTER COMPLETION DEALER SHOULD REMOVE AND RETAIN FOR RECORDS After the Manure Spreader has been completely set up check to be certain it is in correct operating order before delivering to the customer The following is a list of points to inspect Check off each item as you have made the proper adjustments and found the item operating satisfactorily Connect t...

Страница 6: ...Intentionally Left Blank 4 ...

Страница 7: ... when operating this unit Explain recommended loads for different types of materials Explain to customer that regular lubrication is required for proper operation and long life of machine Show customer the lubrication section of Owner s Manual Give the customer Owner s Manual and make sure they read and understand all operating and service instructions Have the customer sign a completed Warranty R...

Страница 8: ...Intentionally Left Blank 6 ...

Страница 9: ...EVER YOUR PERSONAL SAFETY IS INVOLVED TAKE TIME TO BE CAREFUL REMEMBER THE CAREFUL OPERATOR IS THE BEST OPERATOR MOST ACCIDENTS ARE CAUSED BY HUMAN ERROR CERTAIN PRECAUTIONS MUST BE OBSERVED TO PREVENT THE POSSIBILITY OF INJURY OR DAMAGE SAFETY INFORMATION H S MANUFACTURING CO INC ...

Страница 10: ...FORMATION OBSERVE MAXIMUM TRANSPORT SPEED The maximum transport speed for this implement is 32 km h 20 m p h Some tractors are capable of operating at speeds that exceed the maximum transport speed of this implement Regardless of the maximum speed capability of the tractor being used to tow this implement do not exceed the implement s maximum transport speed Exceeding the implements maximum transp...

Страница 11: ...SAFETY INFORMATION 9 ...

Страница 12: ...SAFETY INFORMATION 10 ...

Страница 13: ...T ALLOW PERSONNEL OTHER THAN THE QUALIFIED OPERATOR NEAR THE MACHINE Before starting tractor be sure PTO shields turn freely and PTO is securely locked to tractor DO NOT clean adjust or lubricate the machine when any part is in operation Keep hands feet and clothing away from beaters when they are revolving Loose or floppy clothing should not be worn by the operator Be sure the machine is clear of...

Страница 14: ... 12 ...

Страница 15: ...hten after a few hours of operation as bolts can loosen up on new machinery 5 Lubricate the machine completely check the oil level of the gearbox fill if necessary TRANSPORTING SAFETY Follow state and local regulations when towing farm equipment on public highways Check with local law enforcement agencies for your own particular regulations Unless otherwise prohibited use a slow moving vehicle emb...

Страница 16: ...nt may cause damage to the universal joints of the power takeoff Secure the drawbar so that the hitch pin hole is directly below the power drive line TRACTOR CONNECTIONS If this implement is attached to a tractor with a clevis hitch hammer strap style drawbar the hammer strap must be removed to prevent damage to the IID guarding and the IID telescoping members See Figure1 If this implement is atta...

Страница 17: ...RRANTY OPERATION SPREADING 1 When you are ready to unload make sure the beater is in the engaged position 2 Throttle the tractor down engage the tractor PTO slowly then increase the throttle to 540 RPM s and begin moving Failure to do so will cause damage to the gearbox and drive train 3 When the spreader is almost empty the bed can be cleaned by moving the beater control lever to the disengaged p...

Страница 18: ...ld be 1 4 deflection at the side of the chain when properly adjusted To adjust loosen the bolt holding the tightener Slide the tightener against the drive chain and retighten the bolt Failure to maintain proper tension will result in excessive wear to the chain and sprockets Beater Drive Chain Tightener DRIVE CHAIN To adjust the main drive chain turn the nut on the adjusting rod located at the lef...

Страница 19: ...hubs tighten the castellated nut on the spindle to the point where there is no end play and a slight drag on the bearings Replace the cotter key with a new one of the correct size BEATER The beater paddles are welded to the beater tube Replacement of these paddles should be performed by authorized service personnel who are competent welders When replacing paddles the sharp edge of the teeth must l...

Страница 20: ...res should be inflated to the appropriate pressure listed in the table Tire Pressure 10 00x15 40 PSI Wheel lug torque should be checked after every 50 hours of operation and tightened to the appropriate torque Wheel bolts must be tightened between 60 65 ft lbs of torque SERVICE ...

Страница 21: ... 19 OPTIONAL EQUIPMENT REAR PAN The rear pan shown is optional equipment ...

Страница 22: ...performed on hydraulic components valves cylinders hoses etc PTO ASSEMBLY Care must be taken to keep the male and female driving elements well lubricated and free sliding Failure to observe this precaution will result in excessive pressure being required to collapse or extend the assembly while subject to operating torque This excessive force may damage or displace the jackshaft bearings DO NOT lu...

Страница 23: ...h end of the PTO shaft one in the center One on each front idler sprocket behind the shield One on the side shaft 2 Drive Shaft Right Oil Fill Level 1 Drive Shaft Left Oil Fill Plug One on the front of the jackshaft One on the front of the jack 21 ...

Страница 24: ... 1 540 RPM Maximum Rotating Speed On PTO Shaft 093020 6 Grease Zerk 7143189 1 Beater Disengaged Clean Out 11211176 1 Shear Bolts 111593A 2 Danger Stay Clear of Beater DCRED 2 Red Reflector 66076 1 Zerk Located Behind Shield Your H S Manure Spreader was manufactured with operator safety in mind Located on the Manure Spreader are various decals to aid in operation and warn of danger or caution areas...

Страница 25: ... 23 DECAL LOCATION 1494K 11211176 72203A 1494J 8386 82602 71494A 1494L 9194A 093466 8384 9194B 54033 093020 093020 12794 52703D 8385 71494A BEHIND SHIELD 1494K 66076 311 ...

Страница 26: ... 24 DECAL LOCATION DCRED 111593A 093020 9194B 081312 1494A 1494A 093020 093020 52703D 7143189 DCRED 1494K 111593A 1494J 1494K ...

Страница 27: ...Beater Will Not Disengage Beater Engage Disengage Re adjust or Replace Cable Cable Stretched or Broken Apron Does Not Turn PTO Not Turning Engage Tractor PTO Shear Bolt Sheared Replace Shear Bolt Front Drive Chain Off Replace or Repair Front Broken or Missing Drive Chain Main Apron Broken Replace or Repair Main Apron Keys on Main Apron Shaft Replace Sheared or Missing Sheared or Missing Keys TROUB...

Страница 28: ...SERVICE NOTES 26 ...

Страница 29: ...verall Heigth w 10 00 15 Tires 43 1 2 Wheel Tread 67 1 2 Wheel Tread 68 Diameter of Beater 22 MainApron Chain 67XH Gearbox Drive Single Speed Weight w 10 00 15 Tires 1600 Lbs PTO Speed 540 RPM Capacity Cu Ft Struck Level 75 SwingAway Jack Standard Rear Pan Optional SPECIFICATIONS SUBJECTTO CHANGE WITHOUT NOTICE SPECIFICATIONS ...

Страница 30: ...H S MFG H S MFG H S MFG H S MFG H S MFG CO CO CO CO CO products approved for the FEMA FEMA FEMA FEMA FEMA SEAL OF Q SEAL OF Q SEAL OF Q SEAL OF Q SEAL OF QU U U U UALITY ALITY ALITY ALITY ALITY ...

Отзывы: