GB
90
Install 2 x M6x8 screws in the front insert threads of the
side stones. Hang the front side stones in position using
the key holes in the side profiles.
3 mm
Screw the lower front stone using 4 x concrete screws.
Tighten the screws carefully.
Place the upper front stone on top of the front side
stones. Secure using the 4 concrete screws.
IMPORTANT!
Check that the distance between the door
and upper front stone is 4 mm. If necessary, the insert
feet can be adjusted to achieve an even gap between
both front stones and the door.
7
9
10
8
Important
If the fan is to be installed, this must be performed
before installing the lower front stone.