13.
To install the feed fencing (IV1400), the
mobile strut bar can be removed. After
installing the feed fencing, put the bar back
into place in the fence.
14.
At each segment of the feed fencing
(IV1400), fasten two mounting brackets
(IV1540) to the frame of the feed fence
(IV1400) (10 x 70mm). In doing so, ensure
that the bunk will be easily accessible from
each feeding spot.
Fasten the bunk holders (IV1510) to the
mounting brackets (IV1540) (10 x 30mm).
15.
Secure the stainless steel bunk (IV1530) to
the bunk frame (IV1520) (6 x 20mm
carriage bolt and 6mm washer). Slide the
bunk frame (IV1520), with the stainless
stell bunk (IV1530) in it, into the provided
boreholes in the bunk holders and secure it
with ring pins. The bunk assembly can then
be suspended from the feed fencing using
chains (0.75m).