background image

13.

 

To install the feed fencing (IV1400), the 
mobile strut bar can be removed. After 
installing the feed fencing, put the bar back 
into place in the fence. 

 

14.

 

At each segment of the feed fencing 
(IV1400), fasten two mounting brackets 
(IV1540) to the frame of the feed fence 
(IV1400) (10 x 70mm). In doing so, ensure 
that the bunk will be easily accessible from 
each feeding spot. 
Fasten the bunk holders (IV1510) to the 
mounting brackets (IV1540) (10 x 30mm). 

 

 

15.

 

Secure the stainless steel bunk (IV1530) to 
the bunk frame (IV1520) (6 x 20mm 
carriage bolt and 6mm washer). Slide the 
bunk frame (IV1520), with the stainless 
stell bunk (IV1530) in it, into the provided 
boreholes in the bunk holders and secure it 
with ring pins. The bunk assembly can then 
be suspended from the feed fencing using 
chains (0.75m). 

 

 

Отзывы: