Figure 1. Level HandiWALL® before attaching it to the wall
Figure 2. HandiWALL® installation.
NOTE: Observe all safety precautions
and wear all safety equipment before
proceeding!
1. If necessary, cut your Handi-
WALL® panels to the desired
length using an electric saw with
a thin sharp blade.
2. Mark on your wall where you
want the bottom of your Hand-
iWall® installation to begin (this
may be your floor). (See Figure 1)
3. Pre-drill the concrete with 5/32
drill bit. Fasten the bottom panel
of HandiWALL® with Tapcon®
screws about 16 inches apart.
Be sure to make sure the panel
is level before installing screws.
(See Figure 2)
4. Proceed to install the next Hand-
iWALL® panel on top the first
leveled panel. HandiWALL® can
be cut horizontally if necessary.
Continue with all panels until
complete. Install finish trim.
Installation on Drywall on other side
HandiWALL® Installation on Concrete
GarageCabinets
.com