Hamworthy PUREWELL VariHeat c Скачать руководство пользователя страница 6

HAMWORTHY HEATING LTD                                           Page                                                                                  500005151/B 

 

 

 

2.0 ASSEMBLY INSTRUCTIONS 

 
 
Note: 

To  assemble  the  water  pipe  kit  correctly  the 

boilers  must  be  butted  up  alongside  one  another.  See 
dimensional drawings on pages 4 to 5. 
 
 
2.1.1    Ensure  there  is  enough  room  around  the  boiler 
and  that  the  pathway  to  the  boilers  are  free  and  clear 
from obstructions before starting. 
 
 
2.1.2  Remove  all  coverings  of  the  pipes,  ensure  all 
parts  are  there  and  still  attached  to  the  pallet  and  the 
separate parts such  as the ball  valve, flexible hose etc. 
and attach in the configuration shown.   
 
 
 
 
 
 
 
 
 
2.1.3  Detach  the  upper  section  of  the  pipe  work  from 
the pallet and move into position for either the 70c, 95c, 
110c  boiler  arrangements  by  attaching  it  to  the  lower 
section holes (see figure 2.2.1) 
 
2.1.4  Or attach to the upper section holes for 140c and 
180c arrangement boilers. (see figure 2.2.2) 
 
 
 
 
 
 
 
 
 
 
 
 
 
2.1.5  Bolt  the  two  headers  together  using  the  fixings 
supplied.  
 
 
 
 
 
 
 

Содержание PUREWELL VariHeat c

Страница 1: ...IMPORTANT NOTE THESE INSTRUCTIONS MUST BE READ AND UNDERSTOOD BEFORE INSTALLING COMMISSIONING OPERATING OR SERVICING EQUIPMENT PUREWELL VariHeat c REVERSE RETURN HEADER KITS INSTALLATION INSTRUCTIONS...

Страница 2: ......

Страница 3: ...STALLATION INSTRUCTIONS Purewell VariHeat Condensing Boilers Models PV 70c PV 95c PV 110c PV 140c PV 180c Consisting of 2 3 multiple boiler arrangement THESE INSTRUCTIONS MUST BE READ IN CONJUNCTION W...

Страница 4: ...EMBLY 2 FIGURES 1 2 Boiler Water Pipe Assembly General Overview 1 2 Pipe kit Exploded View 2 2 2 1 Dimensional Overview 2 Boiler Model 70c 95c 110c 4 2 2 2 Dimensional Overview 2 Boiler Model 140c 180...

Страница 5: ...mpetent person must carry out all works referred to in this instruction These header kits are specifically for use with Purewell VariHeat boilers All sub assemblies are pressure tested prior to despat...

Страница 6: ...Remove all coverings of the pipes ensure all parts are there and still attached to the pallet and the separate parts such as the ball valve flexible hose etc and attach in the configuration shown 2 1...

Страница 7: ...Using a suitably rated hoist raise the assembly to approximate finished height gently lower the hoist until the feet touch the floor adjust the feet using the hoist to take the weight till the flexibl...

Страница 8: ...t access to the gas pipe is available 2 1 12 The assembly is now complete Test pipework for leaks then connect gas and water pipes to the gas supply and heating system NOTE The gas supply manifold pip...

Страница 9: ...LTD Page 500005151 B 5 2 2 2 Dimensional Overview 2 Boiler Model 140c 180c 2 2 3 Dimensional Overview 3 Boiler Model 70c 95c 110c 140c and 180c Note Other Dimensions same as previous Boiler Arrangeme...

Страница 10: ...ler build 40mm diameter plastic T junction not HHL supply 40mm diameter plastic tubing not HHL supply To drain From previous boiler NOTE Due to slightly acidic content of condensate HHL recommend that...

Страница 11: ......

Страница 12: ...les Service McDowall Modular Services 2 Penson Road Queenslie Industrial Estate Glasgow G33 4AG tel 0141 336 8795 fax 0141 336 8954 email MMS McDowallModularServices hamworthy heating com North East E...

Отзывы: