HAMWORTHY HEATING LTD Page 500005151/B
2
2.0 ASSEMBLY INSTRUCTIONS
Note:
To assemble the water pipe kit correctly the
boilers must be butted up alongside one another. See
dimensional drawings on pages 4 to 5.
2.1.1 Ensure there is enough room around the boiler
and that the pathway to the boilers are free and clear
from obstructions before starting.
2.1.2 Remove all coverings of the pipes, ensure all
parts are there and still attached to the pallet and the
separate parts such as the ball valve, flexible hose etc.
and attach in the configuration shown.
2.1.3 Detach the upper section of the pipe work from
the pallet and move into position for either the 70c, 95c,
110c boiler arrangements by attaching it to the lower
section holes (see figure 2.2.1)
2.1.4 Or attach to the upper section holes for 140c and
180c arrangement boilers. (see figure 2.2.2)
2.1.5 Bolt the two headers together using the fixings
supplied.