HAMPTON BAY Courtland Shaker Cabinetry Скачать руководство пользователя страница 6

Pre-installation (continued)

INSTALLING WALL CABINETS

Whether you start at a corner or an end, the general approach with wall cabinet installation is to:
1.   Mark on the back of the cabinet where the cabinet will line up with the wall studs (see further instructions page 13).
2.   Predrill the hang rails at the stud locations
3.   Position the cabinet with a support
4.   Loosely attach the cabinet to the wall (or ceiling for peninsulas)
5.   Shim and level
6.   Attach the face frames together
7.   Tighten the cabinet to the wall (or ceiling for peninsulas)

By installing the wall cabinets first, you won’t have to reach over the base cabinets to install the wall cabinets. This will lessen the likelihood of damage to 
base cabinets during the installation process.

TALL CABINETS

Double check the height of your tall cabinets against their intended location on your project layout. Be sure to consider soffits, and how the tall cabinets will 
line up with surrounding cabinets.

6

Installation Requirements

YOUR RESPONSIBILITY AS THE INSTALLER

o

  Installation is done properly.

o

  Door and drawers will require some adjustments at the end. 

o

  Cabinets too far out of level, not shimmed correctly, or supported correctly will end up exceeding  

 

the range of adjustment the product was designed for. 

WARNING: 

Failure to follow these guidelines could result in a cabinet falling off the wall, 

possibly resulting in serious injury, and will void the product warranty.

WARNING: 

DO NOT attempt to lift a cabinet out of the carton; this may result in damage 

to the cabinet or injury to yourself.

CARTON REMOVAL

Open only the cartons you will need as you progress through the installation. Leave other cabinets 
cartoned, out of your way and safe from damage. The product label is located on the front, top, left-hand 
corner on each carton. This will assist in determining the top and front of each cabinet. Lay cartons on the 
back, one at a time. Cut the bottom tape only; do not cut sides. Fold back bottom flaps or cut them off. 
Stand the cabinet upright and lift carton off from the top.

WARNING: 

Be careful to follow the leveling, shimming, and support process outlined to  

avoid exceeding the adjustment limits of the cabinet door hinges and drawer slides.

Содержание Courtland Shaker Cabinetry

Страница 1: ... Friday 9 a m 6 p m EST Saturday 1 855 HD HAMPTON HAMPTONBAY COM THANK YOU We appreciate the trust and confidence you have placed in Hampton Bay through the purchase of this cabinetry product We strive to continually create quality products designed to enhance your home Visit us online to see our full line of products available for your home improvement needs Thank you for choosing Hampton Bay ...

Страница 2: ...all 16 17 STEP 15 Fillers for Various Depth 17 STEP 16 Tall End Filler 24 Deep Wall Cabinet Installation 18 STEP 17 Toekick Platform with 96 Tall Cabinets 18 STEP 18 Oven Cut out and Oven Support Platform 19 STEP 19 Bookcase 20 STEP 20 Vanity Sink Cabinets 20 STEP 21 Conversion of Vanity Drawers to False Front 20 STEP 22 Wall Microwave Shelf 21 STEP 23 Toekick Covers 21 STEP 24 Hardware 21 STEP 25...

Страница 3: ...65WARNINGS CA GOV PRODUCTS HAMPTONBAY COM Please contact 1 855 HD HAMPTON for further assistance Warranty LIMITED LIFETIME WARRANTY WHAT IS COVERED The manufacturer Manufacturer warrants its parts and products to be free of substantial defects in materials and workmanship from the original date of purchase under normal home use This warranty is offered only to the original consumer purchaser and m...

Страница 4: ...s noting any special requirements your cabinets may need for installation Cabinets such as Oven Base Corner Wall Bridge Microwave and Base Cabinets in a corner have special requirements Some of these special requirements may be found in the Installation How To section of these instructions CABINET SUPPORT BRACES Well made braces make installation easier and more accurate Install a straight 1 x 2 l...

Страница 5: ...her you start at a corner or an end the general approach with base cabinet installation is to 1 Position the cabinet 2 Shim and level 3 Attach all the face frames together 4 Predrill the back rail at the wall stud locations 5 Attach all the cabinets to the wall or floor for peninsulas If your project layout has wall cabinets that are to be placed directly on the countertop you should install the b...

Страница 6: ...Y AS THE INSTALLER o Installation is done properly o Door and drawers will require some adjustments at the end o Cabinets too far out of level not shimmed correctly or supported correctly will end up exceeding the range of adjustment the product was designed for WARNING Failure to follow these guidelines could result in a cabinet falling off the wall possibly resulting in serious injury and will v...

Страница 7: ...out to the stop lift the front then pull straight out For shelves push in the top of the shelf clip so you can lift the shelf up and out Remove Screw Door Hinge Cabinet Face Frame Plate Remove Screw Door Hinge Cabinet Face Frame Plate Small Clip Push Shelf 2 2 1 2 3 1 2 10 x 2 1 2 Round Washer Head with No 2 Square Recess Drive or Truss Head with Phillips Drive screw for frame to frame attachment ...

Страница 8: ...s Check for Plumb Out of Square In Square UNEVEN WALLS SQUARE CORNERS Place a straight length of 2 x 4 against the wall to find any high or low spots in the area where the cabinets will be located Scrape or sand high spots Mark low spots that will need shimming when you install cabinets The more you smooth out the walls the less you will need to shim If walls have high spots that you cannot remove...

Страница 9: ...o Repeat this process for all base cabinets and then for all wall cabinets You should now have a Wall Outline for all cabinets to be installed 2 LOCATE AND MARK WALL STUDS o Typical wall construction places wall studs on 16 centers This means that every 16 you have the center of a 2 x 4 wall stud to support your cabinets o To locate a wall stud use a wall stud finder tool o Once you have located a...

Страница 10: ...t Shims may be required between the cabinet and the ceiling o Shim cabinets so they align exactly with the Base Cabinet Top Level Line base cabinets or Wall Cabinet Bottom Level Line wall cabinets Place clamps just above drawer slide and just above bottom hinge Clamp cabinets together loosely o Adjust so Face Frames align perfectly at the top and front edges If you need to tap cabinets for alignme...

Страница 11: ...ng joists using 10 x 3 1 2 Truss Head Screws Use these screws as follows For cabinets 24 or less use 4 screws or 2 screws per frame For cabinets 27 or more use 6 screws or 3 screws per frame o Wall Cabinets up to 18 wide Screw a top and bottom wall attachment screw into one wall stud and the face frame to at least one adjacent cabinet o Wall Cabinets 21 to 36 wide Screw top and bottom wall attachm...

Страница 12: ...acer to account for the difference between the width across the frame and the width across the back of the cabinet INSTALLER NOTE Verify this offset dimension for the spacer since it may vary based on the cabinet model For wall cabinets pre drill a 7 32 clearance hole through the backrail of the cabinet at the wall stud locations while the cabinet is on the floor Ledger Board Transfer Measurement ...

Страница 13: ...r base cabinets in Attachment to Wall section Use 2 1 2 screws and follow the Attachment Minimum Requirements toggle bolts or drywall anchors elsewhere o The length of the Countertop Brace should leave approximately 1 on each end between the Brace and the cabinet Transfer Framing or Joist Locations and Drill 7 32 Clearance Holes WARNING Make sure that the 3 1 2 screws enter 1 1 2 of solid ceiling ...

Страница 14: ...ION DO NOT hang 15 deep wall cabinets independently IMPROPER INSTALLATION Install four 4 screws through hanger rail into wall studs Install four 4 1 1 2 screws through end panel of 15 Deep Wall Cabinet into adjacent cabinet frame stile 15 Deep Wall Cabinet shown with doors removed to make illustration easier to understand Supported Through Back and Adjacent 12 Deep Wall Cabinets Install four 4 scr...

Страница 15: ...ribed in the Frame to Frame Attachment section o Attach a 23 countertop brace on the wall as described previously BASE BLIND CORNER CABINETS CONTINUED o Position the hidden end of the Base Blind Corner cabinet at the proper spacing from the wall The spacing is determined by the opposite end of the row of cabinets this dimension should be noted on the your project layout o Push the adjacent cabinet...

Страница 16: ...r Countertop Braces and install per the requirements found earlier Brace length varies based on cabinet model o With the cabinets in final position shim so they match the Base Cabinet Top Level Line and all frames are flush and plumb o Predrill through the adjacent cabinet face frames into the Base Corner cabinet and fasten with 2 1 2 screws per the Frame to Frame Attachment requirements INSTALLER...

Страница 17: ...cribe the wall contour onto the Wall Filler o Cut the Wall Filler following the scribe mark Put the Filler in position Fasten the Filler to the cabinet frame using the Frame to Frame Attachment requirements Use finishing nails to tack the Wall Filler to the Backer Board if necessary 15 FILLERS FOR VARIOUS DEPTH o When installing cabinets next to each other that are different depths i e 12 deep nex...

Страница 18: ...d slide the cabinet onto the Toekick Platform Attach to the wall following the Attachment to Wall requirements for Tall cabinets 17 TOEKICK PLATFORM WITH 96 TALL CABINETS o The Tall End Filler conceals the side of a refrigerator and supports a 24 Deep Wall Cabinet above Tall End Fillers are shipped without a Toespace Cutout and must be inverted for left or right hand use before marking and cutting...

Страница 19: ...on top of the spacer The bridge cabinet must be installed to the wall using the recommended installation screws o After cutting the proper opening size a Support Platform not included will need to be constructed to carry the weight of the oven once installed It is recommend that this platform be composed of 3 4 plywood on top of 2x4 lumber ripped to the proper thickness to accommodate the lower cr...

Страница 20: ...URY AND WILL VOID THE PRODUCT WARRANTY Special depth bookcase cabinets greater than 12 deep should not be used in wall hung applications o The drawers can be changed to a false front if twin or off center sink bowl locations are required o Remove the drawer Unscrew the Drawer Front from the Drawer Box Unscrew the Drawer Guide from the Face Frame and pull the guide out of the cabinet back o Drill a...

Страница 21: ...net RIGHT WRONG o Measure the length of the toekick area and cut the Toekick Cover to that length Clean the area of any debris Apply glue to the back of the Toekick Cover and place onto the toekick area Use small finishing nails to tack the Toekick Cover in place 23 TOEKICK COVERS o Drill 11 64 holes from the front side of the door for decorative hardware It is recommended to apply masking tape on...

Страница 22: ... and Down Screw B Left or Right Screw C In and Out Screw A Up and Down Screw B Left or Right Screw C In and Out o A Up and down adjustment 2 0mm Loosen Screw A align door tighten Screw A DO NOT overtighten Screw A o B Left or Right adjustment 1 5mm Turn Screw B clockwise or counterclockwise o C In or Out adjustment 5 2 5mm Turn Screw C clockwise or counterclockwise ...

Страница 23: ...Questions problems missing parts Before returning to the store call Hampton Bay Customer Service 8 a m 7 p m EST Monday Friday 9 a m 6 p m EST Saturday 1 855 HD HAMPTON HAMPTONBAY COM ...

Отзывы: