9
Installation
(
continued
)
A. NEW CONSTRUCTION - ATTACHING TO JOIST
B
AA
A11. Position the correct depth mark at the bottom
ge
of the joist based on the thickness of your sheetrock.
ed
A13. Route wires through the strain relief.
A12. Screw pre-loaded screws into the joist or framing.
A14. Connect wires as shown using wire nuts (AA).