7
HAMPTONBAY.COM
Please contact 1-877-527-0313 for further assistance.
Assembly
Locate the Left Side Panel (E), Center Left Shelf (B), Cen-
ter Panel (D), Center Right Shelf (C), Right Side Panel (F),
and set out face down on a scratch-free surface.
Insert one Wood Dowel (CC) into each of the pre-drilled
holes.
Push the Left Side Panel (E) and Center Panel (D) snug
to the Center Left Shelf (B). Make sure the Wood Dowels
are seated in the pre-drilled holes.
Using Bolts (AA) and Washers (BB) attach panels
through pre-drilled holes in the mounting blocks.
HAND TIGHTEN ONLY.
Push the Center Right Shelf (C) and Right Side Panel
(F) snug to the Center Panel (D). Make sure the Wood
Dowels are seated in the pre-drilled holes. Using Bolts
(AA) and Washers (BB) attach panels through pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
Locate Hearth/Base (A) and set out fi nished side up on
the fl oor.
Insert one Wood Dowel (CC) into each of the pre-drilled
holes.
Attach the Completed assembly from step 1 to the
Hearth/Base (A). Make sure that dowels are seated into
the pre-drilled holes in the Hearth/Base. Using Bolts
(AA) and Washers (BB) attach panels throughpre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
1
2
Side panel installation
Base installations
A
F
E
B
C
D