HAMMAR ERRS CP2
ELECTRONIC REMOTE
RELEASE SYSTEM
ERRS CP2 INSTALLATION AND TEST MANUAL
ISSUED 2019-02
Rev.4
Installation information
The first power up of the system after installation (i.e. installing main fuse, connecting battery and
connecting the main connector to the back of the ERRS front panel) shall only be done by trained
personal familiar with the technical function and use of the ERRS system.
Note! After the battery has been connected to the system it will automatically take over the power
supply to the ERRS CP2 system if the ships emergency power supply is switched off or interrupted.
The battery will lose capacity by repeated deep discharging cycles. It is important that the battery
is disconnected in situations where an interrupted emergency power supply can be expected, as
for an example during a stay at a shipyard. Note that there is a backup battery in each ERRS CP2
Control Panel if more than one panel is connected in a network.