Halton Max Ultra Circular (MUC) - Installation, commissioning and maintenance guide 18(31)
Version 1.0
All rights reserved © Halton
4
Commissioning
4.1
Before you start
4.1.1
Commissioning process
The main steps in the commissioning process are:
•
Controller settings
•
Setting the installation parameter
•
Setting the Modbus communication parameters (optional)
4.1.2
Airflow controller display
Halton Max Ultra Circular (MUC) airflow control has a control panel with display and four push
buttons.
Fig.8. Control panel
The LCD display can show 16 characters in 2 lines.
You can toggle between different parameter settings by pressing the arrow buttons. When the
'Setting' parameter is on view you can go back to parameter pages by pressing the OK button. If no
button is pressed, the display goes back into default view. LED lights indicate Modbus
communication. The red light indicates RS-485 Rx communication packet from master. The green
light indicates RS-485 Tx communication packet to master.