1.  Fountains using the MPW Mounting Plate refer to Fig's. 6,8,10, or 12 for hanger bracket
     location and rough-in dimensions.
     NOTE: Review separate installation instructions for details of the MPW Mounting Plate.
     Fountains using the Wall Plate Assy. refer to Fig's. 5,7,9, or 11 for rough-in dimensions.

2.  Shown dimensions pertain to installation location (framing must support up to 150 lbs. weight
     for single fountain and 300 lbs. for dual fountains). These dimensions are required for compliance
     with ANSI Standard A117.0.

3.  Install rough-in plumbing as shown in Fig’s. 5,6,7,8,9,10,11, or 12. Waste line should extend a
     minimum of 2" (51mm) thru the back panel. Run supply water inlet line thru back panel.
     Install a service stop (not provided). Turn on supply water and flush thoroughly.

4.  Installing back panel.
    
 Ftn. w/MPW Mounting Plate: Refer to Fig. 16 for placement of braces onto back panel.
     Place the upper edge of the panel above hanger bracket. Slide the panel down until it engages the
     hanger bracket. Be sure back panel is firmly engaged before releasing it.
     Ftn. w/Wall Plate Assy.: Place the upper edge of the panel above mounting plate on the
     wall. Slide the panel down until it engages the hanger. Be sure back panel is firmly engaged
     before releasing it.

5.  Remove bottom access panel from fountain basin and save the screws.
     Ftn. w/MPW Mounting Plate: Install the fountain to the back panel and wall using (4) 5/16 “ x 6”
     long threaded rods, washers, and nuts (provided). Tighten securely.
     Ftn. w/Wall Plate Assy.: Install the founrain to the back panel and wall using
     (4) 5/16" x 3/4" long bolts and washers (provided) thru holes in back panel. Washer used on
     bottom two (2) holes only. Tighten securely.

6.  Cut waste tube to required length using plumbing hardware and trap (not provided) as a
     guide. Install hardware and trap. Tighten securely.

7.  Make water supply connections from service stop to the fountain strainer. Insert the
     water inlet line into the inlet side of strainer until it reaches a positive stop - about 3/4"
     (See Fig. 2). Turn on water supply and check for leaks. Newly installed water supply line
     should be insulated after leak check is completed. DO NOT SOLDER TUBES INSERTED
     INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.

8.  Check stream height from bubbler. Stream height is factory set at 45-50 PSI. If supply
     pressure varies greatly from this, adjust the screw on regulator (item 14, on page 1).
     Clockwise adjustment will raise stream height and counter-clockwise will lower stream
     height. For best adjustment stream height should be approximately 1-1/2" (38mm) above
     the bubbler guard. (See Figure 3)

9.  Water Valve Mechanism - ADJUSTMENT PROCEDURE:
          - Turn adjustment screw (Item 26, page 11) counter-clockwise until water flow from
            bubbler starts
          - Turn adjustment screw clockwise until water flow stops, then turn an additional
            1/2 turn

10. Replace bottom access panel to fountain using the screws provided. Tighten securely.

Содержание OVL-EBP

Страница 1: ...NGS OVL EBP OVL SBP OVL SEBP OVL ESBP FIG 3 FIG 4 23 24 15 14 Regulator Mounting Bracket IMPORTANT INSTALLER PLEASE NOTE THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE COMPUTERS ETC TO WATER...

Страница 2: ...in and save the screws Ftn w MPW Mounting Plate Install the fountain to the back panel and wall using 4 5 16 x 6 long threaded rods washers and nuts provided Tighten securely Ftn w Wall Plate Assy Ins...

Страница 3: ...C OVL SEBP F OVL ESBP F FIG 5 LEGEND A 1 1 4 O D Waste Tube Trap And Elbow Not Provided B 3 8 O D Unplated Copper Tube Connect Water Inlet C 1 4 6mm DIA Holes For Mounting Plate To Wall FINISHED FLOOR...

Страница 4: ...27 1 2 698mm 28 1 2 724mm 1 2 13mm 8 203mm 16 406mm 27 685mm ADA REQUIREMENT 7 179mm 5 8 16mm 18 457mm FINISHED WALL FINISHED FLOOR 1 7 8 47mm 8 203mm MPW100 MTG PLT REF SEPARATE INSTALLATION INSTRUCT...

Страница 5: ...C OVL SEBP F OVL ESBP F LEGEND A 1 1 4 O D Waste Tube Trap And Elbow Not Provided B 3 8 O D Unplated Copper Tube Connect Water Inlet C 1 4 6mm DIA Holes For Mounting Plate To Wall FIG 7 FINISHED FLOOR...

Страница 6: ...MPW100 MTG PLT HANGER BRACKET BACK PANEL C A B 16 406mm FINISHED FLOOR 33 837mm 7 179mm 5 8 16mm 13 5 16 338mm FINISHED WALL 1 7 8 47mm 8 203mm MPW100 MTG PLT REF SEPARATE INSTALLATION INSTRUCTIONS F...

Страница 7: ...C OVL SEBP F OVL ESBP F FIG 9 LEGEND A 1 1 4 O D Waste Tube Trap And Elbow Not Provided B 3 8 O D Unplated Copper Tube Connect Water Inlet C 1 4 DIA 6mm Holes For Mounting Plate To Wall FINISHED FLOOR...

Страница 8: ...1114mm 3 1 4 82mm 16 406mm 32 813mm 6 5 8 168mm 18 3 4 476mm 1 2 13mm 1 2 13mm A A B B 27 1 2 698mm 28 1 2 724mm 33 5 8 854mm 34 5 8 879mm 33 838mm C HANGER BRACKET BACK PANEL MPW200 MTG PLT MPW200 M...

Страница 9: ...OVL SEBP F OVL ESBP F FIG 11 LEGEND A 1 1 4 O D Waste Tube Trap And Elbow Not Provided B 3 8 O D Unplated Copper Tube Connect Water Inlet C 1 4 DIA 6mm Holes For Mounting Plate To Wall FINISHED FLOOR...

Страница 10: ...ANGER BRACKET C B B A A BACK PANEL FINISHED FLOOR FINISHED WALL 18 457mm 43 7 8 1114mm 5 8 16mm 13 5 16 338mm 27 687mm ADA REQUIREMENT 7 179mm 33 840mm 6 5 8 168mm 18 3 4 476mm MPW200 MTG PLT MPW200 M...

Страница 11: ...21 See Fig 4 3 4 16 17 See Fig 14 FIG 13 PUSH BAR MECHANISM REGULATOR MOUNTING MECHANISM Installing Back Panel When install ing back panel assy Item 34 with MPW Mounting Plate attach channel braces a...

Страница 12: ...ck Panel OVL ESBP AG Wall Plate Assembly OVL SBP Wall Plate Assembly OVL SEBP Wall Plate Assembly OVL EBP Wall Plate Assembly OVL ESBP Back Panel Assy OVL EBP Back Panel Assy OVL SBP Back Panel Assy O...

Отзывы: