97715C (Rev. D - 02/18)
HRFGEBP_A, HRFGSBP_A
Page 5
INSTALLATION INSTRUCTIONS
STAINLESS STEEL BACK PANEL
1.
Wall should already be framed for the fountain
using the positioning dimensions shown in Fig 4. Shown
dimensions pertain to installation location (framing must support up to 150 lbs. weight). These dimensions are
required for compliance with ANSI Standard A117.0.
2.
Attach wall plate assembly to wall
as shown in Fig 4 using 5/16" x 2" long bolts and flat washers (not provided).
Tighten securely. (Fastener must match wall type, i.e. lag screws for wood studs, bolts and anchors for
masonary construction.)
3.
Install back panel.
Place the upper edge of the panel above hanger on the wall. Slide the panel down until it
engages the hanger. Be sure back panel is firmly engaged before releasing it.
4.
Install rough-in plumbing
as shown in Fig 4. Waste line should extend a minimum of 2" (51mm) thru the back
panel. Run supply water inlet line thru back panel. Install a service stop (not provided). Turn on supply water
and flush thoroughly.
5.
Remove bottom access panel
from fountain basin and save the screws. Install the fountain to the back panel
and wall using (4) 5/16" x 1-1/4" long bolts and washers thru holes in back panel. Bolts should be long enough to
securely fasten the fountain to the wall. Tighten securely, but do not over tighten. Over tightening will crack
the Marblyte Fountain.
6.
Remove elbow from end of p-trap
(item 1) and attach it to drain tube. Re-attach elbow to p-trap and cut waste
tube to required length using plumbing hadware and trap as guide.
7.
Make water supply connections
from service stop to the fountain strainer (item 16) by inserting the water inlet
line into the inlet side of strainer until it reaches a positive stop about 3/4", (See Fig 1, Page 1). Turn on water
supply and check for leaks. Newly installed water supply line should be insulated after leak check is completed.
DO NOT SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS MAY RESULT.
8.
These products are designed
to operate on 20-105 PSI supply line pressure. If inlet pressure is above 105 PSI,
a pressure regulator must be installed in the supply line. Any damage caused by reason of connecting these
products to supply line pressure lower than 20 PSI or higher than 105 PSI is not covered by warranty.
9.
Check stream height from bubbler.
Stream height is factory set at 45-50 PSI. If supply pressure varies greatly
from this, adjust the screw on regulator item 3 by using a small screwdriver through the small hole in the push
button item 8 (See Fig 5). Clockwise adjustment will raise stream height and counter-clockwise adjustment will
lower stream height. For best adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler
guard (See Fig 7, Page 6).
10.
Replace bottom access panel
to fountain basin using screws provided. Tighten securely.