INSTALLATION INSTRUCTIONS

STAINLESS STEEL BACK PANEL

1.  

Wall should already be framed for the fountain

 using the positioning dimensions

     shown in Fig's. 2.  Shown dimensions pertain to installation location

     (framing must support up to 150 lbs. weight).  These dimensions are required for

     compliance with ANSI Standard A117.0.

2.  

Attach wall plate assembly to wall

 as shown in Fig's. 2  using 5/16" x 2" long

      bolts and flat washers (not provided). Tighten securely. (Fastener must match wall

      type, i.e. lag screws for wood studs, bolts and anchors for masonary construction.)

3.  

Install back panel.

 Place the upper edge of the panel above hanger on the wall.

      Slide the panel down until it engages the hanger. Be sure back panel is firmly

      engaged before releasing it.

4.  

Install rough-in plumbing

 as shown in Fig. 2.  Waste line should extend a

      minimum of  2" (51mm) thru the back panel.  Run supply water inlet line thru back panel.

      Install a service stop (not provided).  Turn on supply water and flush thoroughly.

5.  

Remove bottom access panel 

from fountain basin and save the screws. Install the

      fountain to the back panel and wall using (4) 5/16" x 1-1/4" long bolts and washers

      thru holes in back panel.  Bolts should be long enough to securely fasten the

      fountain to the wall.  Tighten securely, but do not over tighten.  Over tightening will crack

      the Marblyte Fountain.

6.  

Remove elbow from end of p-trap

 (item 1) and attach it to drain tube.  Re-attach elbow

     to p-trap and cut waste tube to required length using plumbing hadware and trap as guide.

7.  

Make water supply connections

 from service stop to the fountain strainer (item 16) by

     inserting the water inlet line into  the inlet side of strainer until it reaches a positive stop

     about 3/4", (See Figure 6, Page 7).  Turn on water supply and check for leaks. Newly

    installed water supply line should be insulated after leak check is completed. 

DO NOT

   SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS

   MAY RESULT.

8.  

These products are designed 

to operate on 20-105 PSIG supply line pressure.  If

      inlet pressure is above 105 PSIG, a pressure regulator must be installed in the supply

      line.  Any damage caused by reason of connecting these products to supply line

      pressure lower than 20 PSIG or higher than 105 PSIG is not covered by warranty.

9. 

 Check stream height from bubbler.

 Stream height is factory set at 45-50 PSI. If supply

     pressure varies greatly from this, remove items 8 & 12 (See Figure 3, Page 6) by loosening

     set screw (item 15) and adjust the screw on regulator (item 14). Clockwise adjustment will

     raise stream height and counter-clockwise  adjustment will lower stream height. For best

     adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler guard

     (See Figure 7, Page 7).

8.  

Replace bottom access panel 

to fountain basin using screws provided. Tighten

      securely.

Содержание HRFG-EBP

Страница 1: ...LEASE NOTE THE GROUNDING OF ELECTRICAL EQUIPMENT SUCH AS TELEPHONE COMPUTERS ETC TO WATER LINES ISACOMMON PROCEDURE THIS GROUNDING MAY BE IN THE BUILDING OR MAY OCCURAWAY FROM THE BUILDING THIS GROUND...

Страница 2: ...INISHED FLOOR HRFG EBP HRFG SBP ROUGH IN MARBLYTE BACK PANEL DETAIL 1 LEGEND A RECOMMENDED WATER SUPPLY LOCATION 3 8 O D UNPLATED COPPER TUBE CONNECT B RECOMMENDED LOCATION FOR WASTE OUTLET 1 1 4 O D...

Страница 3: ...d by reason of connecting these products to supply line pressure lower than 20 PSIG or higher than 105 PSIG is not covered by warranty 7 Check stream height from bubbler Stream height is factory set a...

Страница 4: ...ER SUPPLY LOCATION 3 8 O D UNPLATED COPPER TUBE CONNECT STUBBED 1 1 2 38mm FROM WALL SHUT OFF BY OTHERS B RECOMMENDED LOCATION FOR WASTE OUTLET 1 1 4 O D DRAIN STUBBED 6 5 8 168mm FROM THE WALL C 1 1...

Страница 5: ...ghten Over tightening will crack the Marblyte Fountain 6 Remove elbow from end of p trap item 1 and attach it to drain tube Re attach elbow to p trap and cut waste tube to required length using plumbi...

Страница 6: ...97715C Rev B 5 04 HRFGEBP_A HRFGSBP_A FIG 3 8 12 9 BASIN 3 14 24 6 10 SEE FIG 7 TOP VIEW 17 22 19 18 1 21 2 4 20 16 11 5 7 SEE FIG 3 13 FIG 4 PAGE 6 23 15 25...

Страница 7: ...LLET TO RELEASE TUBE PUSHING TUBE IN BEFORE PULLING IT OUT HELPS TO RELEASE TUBE FIG 6 OPERATION OF QUICK CONNECT FITTINGS FIG 5 NOTE WATER FLOW DIRECTION BUILDING WATER INLET SERVICE STOP NOT FURNISH...

Страница 8: ...028C 56031C 56027C 56030C 56029C 56032C 23187C 23189C 70012C 100322740560 75554C 15029C 28158C 28170C 45736C 70023C 56092C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 DESCRIPTION...

Отзывы: