97715C (Rev. B - 5/04)
HRFGEBP_A, HRFGSBP_A
PAGE 5
INSTALLATION INSTRUCTIONS
STAINLESS STEEL BACK PANEL
1.
Wall should already be framed for the fountain
using the positioning dimensions
shown in Fig's. 2. Shown dimensions pertain to installation location
(framing must support up to 150 lbs. weight). These dimensions are required for
compliance with ANSI Standard A117.0.
2.
Attach wall plate assembly to wall
as shown in Fig's. 2 using 5/16" x 2" long
bolts and flat washers (not provided). Tighten securely. (Fastener must match wall
type, i.e. lag screws for wood studs, bolts and anchors for masonary construction.)
3.
Install back panel.
Place the upper edge of the panel above hanger on the wall.
Slide the panel down until it engages the hanger. Be sure back panel is firmly
engaged before releasing it.
4.
Install rough-in plumbing
as shown in Fig. 2. Waste line should extend a
minimum of 2" (51mm) thru the back panel. Run supply water inlet line thru back panel.
Install a service stop (not provided). Turn on supply water and flush thoroughly.
5.
Remove bottom access panel
from fountain basin and save the screws. Install the
fountain to the back panel and wall using (4) 5/16" x 1-1/4" long bolts and washers
thru holes in back panel. Bolts should be long enough to securely fasten the
fountain to the wall. Tighten securely, but do not over tighten. Over tightening will crack
the Marblyte Fountain.
6.
Remove elbow from end of p-trap
(item 1) and attach it to drain tube. Re-attach elbow
to p-trap and cut waste tube to required length using plumbing hadware and trap as guide.
7.
Make water supply connections
from service stop to the fountain strainer (item 16) by
inserting the water inlet line into the inlet side of strainer until it reaches a positive stop
about 3/4", (See Figure 6, Page 7). Turn on water supply and check for leaks. Newly
installed water supply line should be insulated after leak check is completed.
DO NOT
SOLDER TUBES INSERTED INTO THE STRAINER AS DAMAGE TO THE O-RINGS
MAY RESULT.
8.
These products are designed
to operate on 20-105 PSIG supply line pressure. If
inlet pressure is above 105 PSIG, a pressure regulator must be installed in the supply
line. Any damage caused by reason of connecting these products to supply line
pressure lower than 20 PSIG or higher than 105 PSIG is not covered by warranty.
9.
Check stream height from bubbler.
Stream height is factory set at 45-50 PSI. If supply
pressure varies greatly from this, remove items 8 & 12 (See Figure 3, Page 6) by loosening
set screw (item 15) and adjust the screw on regulator (item 14). Clockwise adjustment will
raise stream height and counter-clockwise adjustment will lower stream height. For best
adjustment stream height should be approximately 1-1/2" (38mm) above the bubbler guard
(See Figure 7, Page 7).
8.
Replace bottom access panel
to fountain basin using screws provided. Tighten
securely.