background image

PAGE 9

97649C (Rev. E - 5/04)

HRFSBP - FR    HRFEBP - FR    HRFSEBP - FR

The freeze resistant package must be mounted on an interior wall in a heated area.  The room temperature of the interior

heated area must be 50° F (10° C) or higher. The freeze resistant package may be surface or recessed mounted.  If recess

mounted the surface of the cover must be flush with the interior wall surface.  The package is furnished with screws for

mounting the cover to the box.  If the box is recess mounted, do not fasten the top and bottom of the cover to the box.  Use

the holes on the front only.

1. Assemble the operating cable to the fountain bracket.  (Fountain should be mounted to exterior wall)  Create a loop in

the cable and thread the free end of the cable through the wall into the freeze resistant box.  The adjustment nuts should

be in the middle of threaded area on the operating cable.  See Figure 11

2. Connect free end of operating cable to the valve-operating bracket.  The end of the cables must be recessed into the

indents on the pivot brackets.

3. Remove cable free play by adjusting the jam nuts on the ends of the operating cable.  See Figure 8

4. Connect water line from fountain bubbler into freeze resistant box.  The connection to the box uses a quick connect

water fitting.  Position the water line, in the fountain, to drain back into interior mounted box.  Any water left standing, in

the exterior line, can freeze.

To insert tubing, push tube straight into fitting until it reaches a positive stop.  To remove tubing from the fittings, relieve

water pressure, push in on dark gray collar while pulling out on the tubing.  See Figure 13

5. Connect drain and water supply lines to the freeze resistant fountain.  Refer to Figure 1 for component positions.  Inline

strainer must be used on the inlet water line.

Start-up

1. Turn on building water supply and check all connections for leaks.  Repair as required.

2. Stream height is factory set at 35 PSI.  If stream height needs to be changed adjust the regulator in the freeze resistant

package. Clockwise adjustment raises stream height, counter clockwise adjustment will lower stream.

3. Adjust operating cable as required.  Cable system should have a minimal amount of free play to allow for proper valve

operation.  If the system is too tight the valve will stay in the on position creating constant water flow.  Too much free

play will result in non-operation of the valve with the push-buttons.

4. Note:  Water from the drain back tube in the freeze resistant package, will continue to run while the valve is actuated.

5. After cable system is adjusted properly stuff flexible insulation into any openings between the outside wall and the

interior box.

6. Recheck all connections.  If all connections are leak free replace cover(s) on the freeze resistant box(es) and fountain(s).

FIG. 12

NOTE: WATER FLOW DIRECTION

BUILDING WATER

INLET

SERVICE STOP

(NOT FURNISHED)

1/4" O.D. TUBE

WATER INLET

3/8" O.D. UNPLATED

COPPER TUBE CONNECT

COLD WATER SUPPLY

TUBE IS

SECURED

IN POSITION

SIMPLY PUSH IN

TUBE TO ATTACH

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE

FIG. 13

OPERATION OF QUICK CONNECT FITTINGS

Содержание HRFEBP-FR

Страница 1: ...SHOULD BE MADE OF PLASTIC TO ELECTRICALLY ISOLATE THE FOUNTAIN FROM THE BUILDING PLUMBING SYSTEM IMPORTANT ALL SERVICE TO BE PERFORMED BY AN AUTHORIZED SERVICE PERSON HRFSBP FR HRFSEBP FR To assure yo...

Страница 2: ...FR HRFSEBP FR FIG 1 HRFSBP FR MOUNTING BOLT AND ACCESS HOLE LAYOUT LEGEND A 1 3 4 DIA 44mm HOLE FOR WASTE LINE B 7 8 DIA 22mm HOLE FOR WATER SUPPLY TUBE C 7 8 DIA 22mm HOLE FOR OPERATING CABLE D 1 4...

Страница 3: ...d for compliance with ANSI Standard A117 1 and ADA Framing shown for reference only 2 Remove bottom cover from fountain and save the screws 3 Install the fountain using bolts and washers not provided...

Страница 4: ...FR HRFSEBP FR FIG 3 HRFEBP FR MOUNTING BOLT AND ACCESS HOLE LAYOUT LEGEND A 1 3 4 DIA 44mm HOLE FOR WASTE LINE B 7 8 DIA 22mm HOLE FOR WATER SUPPLY TUBE C 7 8 DIA 22mm HOLE FOR OPERATING CABLE D 1 4...

Страница 5: ...d for compliance with ANSI Standard A117 1 and ADA Framing shown for reference only 2 Remove bottom cover from fountain and save the screws 3 Install the fountain using bolts and washers not provided...

Страница 6: ...FR HRFSEBP FR FIG 5 LEGEND A 1 3 4 DIA 44mm HOLE FOR WASTE LINE B 7 8 DIA 22mm HOLE FOR WATER SUPPLY TUBE C 7 8 DIA 22mm HOLE FOR OPERATING CABLE D 1 4 DIA 6mm HOLES FOR MOUNTING PLATE TO WALL HRFSEB...

Страница 7: ...mpliance with ANSI Standard A117 1 and ADA Framing shown for reference only 2 Remove bottom covers from fountains and save the screws 3 Install the fountains using bolts and washers provided Tighten s...

Страница 8: ...PAGE 8 97649C Rev E 5 04 HRFSBP FR HRFEBP FR HRFSEBP FR FIG 10 FIG 11 FIG 7 FIG 8 See Fig 11 See Fig 7 FIG 9 CABLE SHEATHADJUSTMENT To Increase Free Play To Reduce Free Play...

Страница 9: ...stop To remove tubing from the fittings relieve water pressure push in on dark gray collar while pulling out on the tubing See Figure 13 5 Connect drain and water supply lines to the freeze resistant...

Страница 10: ...PAGE 10 97649C Rev E 5 04 HRFSBP FR HRFEBP FR HRFSEBP FR THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 11: ...PAGE 11 97649C Rev E 5 04 HRFSBP FR HRFEBP FR HRFSEBP FR THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 12: ...EVE PUSHBUTTONGUIDE SNAPBUSHING BUMPER REG VALVEASSY PUSHBUTTON EXTENSION PIVOTROD FOUNTAINARM SHORT FOUNTAINARM LONG BOTTOM COVER PLATE SHORT BOTTOM COVER PLATE LONG BACK PANEL HRFSBP BACK PANEL HRFE...

Отзывы: