Halsey Taylor CONTOUR HRFER-EE-Q Скачать руководство пользователя страница 2

2

HRFEREEQ*C   HRFEREEQ*2C   HRFSEREEQ*C

97880C - 2/05

Figure 3 – Water Supply Connections

Installation Package

The components for installation are packed in three
separate boxes, regardless of the type of unit being
installed. The boxes contain the following:

Box  No. 1: Wall Frame(s)
Box  No. 2: Remote Chiller, SJ8-Q
Box  No. 3: Fountain(s), Arm(s) and Panels

Additional materials, as noted in the Parts List, are also
shipped in these boxes.

Number Required

26837C

26839C

26833C

27026C

55001035

27624C

55000661

55000665

100322740560

111008343890

111577243890

111577343890

112627543890

15005C

22525C

27057C

27240C

31375C

31376C

31384C

38417001

40045C

45662C

45663C

50203C

50986C

51409C

51544C

55905C

56082C

56092C

56159C

61313C

70016C

70208C

70682C

70683C

70817C

70989C

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

Parts List

Upper Panel (HRFER-EE)

Upper Panel (HRFSER-EE)

Lower Panel (HRFER-EE)

Lower Panel (HRFSER-EE)

Standard Reach Arm

Extended Reach Arm (EE)

Bottom Cover - Standard Reach

Bottom Cover - Extended Reach (EE)

Bubbler Gasket

Screw #10-24 x .62 HHMS

Screw 5/16-18 x .75

Hex Nut 5/16-18

Screw #10-24 x .50 PHTC

Regulator Retaining Nut

Regulator Mounting Bracket

Regulator Mounting Bracket

Support Bracket

Solenoid Valve Assy.

Power Cord

Sensor Assy.

Screw #8-18 x .37 HHSM

Hex Nut

Push Button

Push Button Sleeve

Strain Relief Bushing

Regulator Holder

Spacer

Bubbler

Bubbler - EasyFlex (Option)

Regulator Nut

Poly Tubing 1/4” (Cut To Length)

Bubbler Nipple

Regulator - W/Red Spring

Nut

Screw

Fitting - Tee 1/4”

Fitting - Union 1/4”

Fitting - Elbow 1/4”

Ground Screw #8-36 x .37

Item

Part No.

Description

HRFER-EE-Q

See

Fig.

1

-

1

-

-

1

-

1

2

4

4

4

7

-

1

-

1

1

1

1

2

1

-

-

1

1

2

1

1

1

1

1

1

2

2

-

1

1

1

11, 22

11, 22

13, 22

13, 22

22

22

22

22

19

5, 8

5, 8

5, 8

22

20

21

20

21

18

18

21

5, 8

20, 21

20

20

21

20, 21

21

19

19

26

15, 16

19

20, 21

21

21

16

15

18

18

-

1

-

1

1

1

1

1

4

5

8

8

12

1

1

1

1

1

1

1

2

4

1

1

1

2

2

2

2

1

1

2

2

2

2

1

-

1

1

HRFSER-EE-Q

NOTE: WATER FLOW

DIRECTION

BUILDING WATER
INLET

    SERVICE STOP

(NOT FURNISHED)

1/4" O.D. TUBE

WATER INLET

TO COOLER

3/8" O.D. UNPLATED

COPPER TUBE CONNECT

COLD WATER SUPPLY

Содержание CONTOUR HRFER-EE-Q

Страница 1: ...LER NOTE It is common practice to ground electrical hardware such as telephones computers and other devices to available water lines This can however cause electrical feedback in the plumbing circuit...

Страница 2: ...ER EE Standard Reach Arm Extended Reach Arm EE Bottom Cover Standard Reach Bottom Cover Extended Reach EE Bubbler Gasket Screw 10 24 x 62 HHMS Screw 5 16 18 x 75 Hex Nut 5 16 18 Screw 10 24 x 50 PHTC...

Страница 3: ...2 43 44 N S Fitting 1 4 NPTF Cap Screw 6 32 x 25 Drain Assy Includes items 39 thru 43 Strainer Ferrule Assy Drain Trap Fitting Elbow 1 4 Tailpipe Gasket Rubber Washer Strainer Supplied with Chiller Al...

Страница 4: ...obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up to...

Страница 5: ...m holes and fasten the assembly to the wall opening using appropriately sized screws or bolts and nuts not provided MODEL HRFSER EE Q FINISHED FLOOR 18 457mm 5 8 16mm 12 1 4 311mm 12 305mm 1 25mm 11 2...

Страница 6: ...to obtain proper rim and bubbler heights for compliance with ANSI standard A117 1 2 Reinforce the wall opening on all sides to adequately support the water fountain This reinforcement must support up...

Страница 7: ...rt loose ends of rods into holes on sides of shelf panel Using appropriately sized screws or bolts not provided fasten the shelf and frame to the bottom of wall opening Secure the frame sides and top...

Страница 8: ...n the marked chiller inlet port See Figs 15 16 Attach an unplated and deburred copper water inlet line and a service stop not provided to the chiller Turn on the water supply and flush the line thorou...

Страница 9: ...Electronic sensor units only remove bottom access panel and turn adjustment screw on the regulator Item 29 Fig 21 Clockwise adjustment will raise stream height and counterclockwise movement will lower...

Страница 10: ...e mechanism or operates erratically check the following a Ensure there are no obstructions within a 40 inch radius from the front of fountain b Check wire connections at the solenoid valve and at the...

Страница 11: ...C Figure 22 Fountain Assembly Side View Figure 21 Electronic Sensor Fountain Assembly 2222 CAMDEN COURT OAK BROOK IL 60523 630 574 3500 PRINTEDINU S A 40 25 See Fig 19 30 15 16 23 12 19 29 26 31 5 10...

Отзывы: