background image

97799C (Rev. D - 5/04)

4705  FR FTN

PAGE 5

FIG. 10

FIG. 11

The freeze resistant package must be mounted on an interior wall in a heated area.  The room temperature of the interior

heated area must be 50° F (10° C) or higher. The freeze resistant package may be surface or recessed mounted.  If recess

mounted the surface of the cover must be flush with the interior wall surface.  The package is furnished with screws for

mounting the cover to the box.  If the box is recess mounted, do not fasten the top and bottom of the cover to the box.  Use

the holes on the front only.

1. Assemble the operating cable to the fountain bracket.  (Fountain should be mounted to exterior wall)  Create a loop in

the cable and thread the free end of the cable through the wall into the freeze resistant box.  The adjustment nuts should

be in the middle of threaded area on the operating cable.  See Figure 9

2. Connect free end of operating cable to the valve-operating bracket.  The end of the cables must be recessed into the

indents on the pivot brackets.

3. Remove cable free play by adjusting the jam nuts on the ends of the operating cable.  See Figure 6

4. Connect water line from fountain bubbler into freeze resistant box.  The connection to the box uses a quick connect

water fitting.  Position the water line, in the fountain, to drain back into interior mounted box.  Any water left standing, in

the exterior line, can freeze . See Fig. 8

To insert tubing, push tube straight into fitting until it reaches a positive stop.  To remove tubing from the fittings, relieve

water pressure, push in on dark gray collar while pulling out on the tubing.  See Figure 11

5. Connect drain and water supply lines to the freeze resistant fountain.  Refer to Figure 1 for component positions.  Inline

strainer must be used on the inlet water line.  See Fig. 10

Start-up

1. Turn on building water supply and check all connections for leaks.  Repair as required.

2. Stream height is factory set at 35 PSI.  If stream height needs to be changed adjust the regulator in the freeze resistant

package. Clockwise adjustment raises stream height, counter clockwise adjustment will lower stream.

3. Adjust operating cable as required.  Cable system should have a minimal amount of free play to allow for proper valve

operation.  If the system is too tight the valve will stay in the on position creating constant water flow.  Too much free

play will result in non-operation of the valve with the push-buttons.

4. Note:  Water from the drain back tube in the freeze resistant package, will continue to run while the valve is actuated.

5. After cable system is adjusted properly stuff flexible insulation into any openings between the outside wall and the

interior box.

6. Recheck all connections.  If all connections are leak free replace cover(s) on the freeze resistant box(es) and fountain(s).

1/4" O.D. TUBE

WATER INLET

NOTE: WATER FLOW DIRECTION

BUILDING WATER

INLET

3/8" O.D. UNPLATED

COPPER TUBE CONNECT

COLD  WATER SUPPLY

SERVICE STOP

(NOT FURNISHED)

OPERATION OF QUICK CONNECT FITTINGS

SIMPLY PUSH IN

TUBE TO ATTACH

TUBE IS SECURED

IN POSITION

PUSH IN COLLET

TO RELEASE TUBE

PUSHING TUBE IN BEFORE

PULLING IT OUT HELPS TO

RELEASE TUBE.

Содержание 4705 FR FTN

Страница 1: ...lled on an interior heated wall The interior space must maintain a minimium temperature of 50 F 10 C Refer to the Freeze Resistant Package for the rough in dimensions for installation IMPORTANT ALL SE...

Страница 2: ...RESISTANT STEEL FOUNTAIN MOUNTING HOLE AND ACCESS HOLE LAYOUT LEGEND A MOUNTING HOLE LOCATIONS 4 1 2 DIA BOLTS NOT PROVIDED B 7 8 DIA 22mm HOLE FOR WATER SUPPLY TUBE C 7 8 DIA 22mm HOLE FOR OPERATING...

Страница 3: ...These dimensions are required for compliance withANSI StandardA117 1 and ADA Framing shown for reference only 2 Remove bottom cover from fountain and save screws 3 Install the fountain using bolts an...

Страница 4: ...97799C Rev D 5 04 4705 FR FTN PAGE 4 FIG 5 CABLE SHEATHADJUSTMENT To Increase Free Play To Reduce Free Play FIG 6 FIG 7 FIG 9 FIG 8...

Страница 5: ...tive stop To remove tubing from the fittings relieve water pressure push in on dark gray collar while pulling out on the tubing See Figure 11 5 Connect drain and water supply lines to the freeze resis...

Страница 6: ...97799C Rev D 5 04 4705 FR FTN PAGE 6 THIS PAGE LEFT INTENTIONALLY BLANK...

Страница 7: ...97799C Rev D 5 04 4705 FR FTN PAGE 7 THIS PAGE LEFT INTENTIONALLY BLANK...

Страница 8: ...Torx Screw 10 24 Set Screw 6 32 x 31 Elbow Fitting 1 4 x 90 Seal Washer Pivot Rod Snap Bushing Retainer Set Screw 6 32 x 12 Torx Bit T 25 Allen Wrench Paint Touch up Pen DESCRIPTION Touch up Paint For...

Отзывы: