For transportation, the LiDAR and its power supply unit are housed in a transit case that has a removable wheeled 
base, with all of the wheels having integral brakes. The transit case with LiDAR weighs approximately 110Kg and will 
need to be moved according to the appropriate manual handling health and safety guidelines.  
 

Unpacking (reverse the process when packing). 

 
The transit case consists of 3 separate pieces. The LiDAR is packed fully assembled. 
 

 

 

 

 

  

 

Remove the top section and set it to one 
side. The LiDAR will now be exposed, and 
the integral foam blocks that stop the unit 
from moving in transit can be seen. 

Note the relative height of the leg tops 
compared to the top of the mid-section 
transit case. This is the height that the legs 
will need to be adjusted to for re-packing. 

Содержание Stream Line XR

Страница 1: ...ntinuous and unattended mode of operation Typical applications include boundary layer wind profiling plume dispersion analysis of complex flows cloud studies cloud base measurements and gust and air q...

Страница 2: ...irus is off Windows time syncing is disabled Daylight saving adjustment is disabled Video resolution is 1280 x 1024 BIOS settings The PC is set to come on with power The PC will come on at 12 20 PM if...

Страница 3: ...to be observed at all times The LiDAR should be sited in such a way as to minimise the amount of heat generated by close surfaces such as tarmac or sunlight falling on it The temperature specification...

Страница 4: ...nsit Case Packing and Unpacking 2 Connections 3 Power requirements and the UPS module 4 Powering up 5 Orientation and levelling 6 Site considerations 7 Routine cleaning 8 Typical thermal characteristi...

Страница 5: ...he appropriate manual handling health and safety guidelines Unpacking reverse the process when packing The transit case consists of 3 separate pieces The LiDAR is packed fully assembled Remove the top...

Страница 6: ...that it be left at this position The small pillars with rubber coned ends act as support legs when the 4 main legs are not attached They prevent the weight of the LiDAR being taken by the cooling agg...

Страница 7: ...coming from the power supply module F 1 10A 5x20mm fuse for the LiDAR circuit F 2 10A 5x20mm fuse for the heaters and the thermo electric cooler TEC circuit if fitted There are 5 small LEDs close to...

Страница 8: ...er un wired smaller connector and the white purging line The arrow on the power connector faces away from the LiDAR when it is the correct orientation The connector is a turn bayonet type Ensure that...

Страница 9: ...e to the UPS and if a power cut happens a warning message will be displayed in the software tab area which will warn that a power cut is detected and the time remaining until the LiDAR shuts down With...

Страница 10: ...e main connector body using a left hand thread Recommended PSU for connection to the 24V DC input power protection module It is recommended that the no load voltage of the PSU be turned up to 25 5V be...

Страница 11: ...internal PC will be fully booted approximately 1 minute later indicated by the flashing green LED on the connector panel cluster If the unit has been allowed to cool down to below 15 C then additional...

Страница 12: ...degrees Note For CSM scan files which are defined in motor encoder counts not degrees the offset bearing will not be used and all movements are with respect to the home position zero counts It will be...

Страница 13: ...the heat generated underneath the LiDAR from direct sunlight a turfed area is ideal or shading if possible Ambient temperatures quoted in the temperature specification of the LiDAR are with respect to...

Страница 14: ...coverage of the clear aperture is not too high The output window has a hard anti reflection coating on the outer surface The coating is reasonably robust but should it be deemed necessary to clean it...

Страница 15: ...n If fuse F 2 is not blown then there may be a fault with the cooling unit in which case the LiDAR should be powered down to avoid the risk of it over heating Passive temperature option The heat excha...

Страница 16: ...passwords needed to access the system are either removed or are sent to Halo prior to sending the system The system is packed in the same way that it was received The Unpacking section can be used for...