1
2
3
Get Started:
This box includes:
• Alicat device
• NIST traceable calibration certificate
• Power and communication cable
• Optional accessories
(filters, fittings)
Power
The battery is shipped
without a charge. Once
fully charged, it lasts
up to 18 hours. Use the
supplied power cable
with an outlet adapter
for fastest charging.
Tare
Before installing
the device into your
process, press the
TARE FLOW
button
on the main screen.
This will zero out
(tare) your unit.
You're Ready to Connect:
Model
Series
Maximum
line pressure
Maximum
differential pressure
MB, MBS
145 PSIG
75 PSID
MWB
45 PSIG
10 PSID
MBQ
305 PSIG
75 PSID
Gas and Units
Select your gas from the menu:
MENU → BASIC CONFIG → GAS
.
Ensure the proper units are
selected. Press the button next
to the parameter you want to
change on the main screen,
then
SET DEVICE ENG UNITS
.
4
Ensure the flow path is the
same direction as the flow
arrow shown on your unit.
5
Verify the requirements for
pressure above, and connect
the device to your process.
DOC-MANUAL-MB-QUICK
Rev 0 • 2020-07-06
Download the full manual:
Annual Calibration
•
Troubleshooting
•
Questions
Consult your
Alicat manual
or contact us at
520-290-6060
or