background image

1

2

3

Get Started:

This box includes:

• Alicat device

• NIST traceable calibration certificate 

• Optional accessories

 

(cables, power adapters, filters)

Power

The power supply 

input is on top. Most 

devices require 

12–24Vdc and 40mA. 

See 

Power and Signal 

Connections

 in the 

manual for details.

Tare

Before installing 

the device into your 

process, press the 

TARE FLOW

 button 

on the main screen. 

This will zero out 

(tare) your unit.

You're Ready to Connect:

Model 

Series

Maximum 

line pressure

Maximum 

differential pressure

M, MS

145 PSIG

75 PSID

MW

45 PSIG

10 PSID

MQ

305 PSIG

75 PSID

Gas and Units 

Select your gas: Use 

MENU → BASIC CONFIG → GAS

.

Ensure the proper units are 

selected. Press the button next 

to the parameter you want to 

change on the main screen, 

then 

SET DEVICE ENG UNITS

4

Ensure the flow path is the 

same direction as the flow 

arrow shown on your unit.

5

  

Verify the requirements for 

pressure above, and connect 

the device to your process.

DOC-MANUAL-M-QUICK 

Rev 0 • 2020-07-06

Download the full manual:

 Alicat.com/manuals

Annual Calibration 

 Troubleshooting 

 Questions

Consult your 

Alicat manual

 or contact us at 

520-290-6060 

or 

[email protected]

Отзывы: