background image

B

Dear Customer!

The assembly of your new greenhouse 
requires no technical knowledge. However, it 
is important that the assembly instruction is 
strictly followed.  The assembly instruction is 
a combination of text and illustrations. 
Erect one pack at a time. All nuts and bolts 

and fittings are found in bag No. 0 (specified 

on page 12). Each pack is specified in 

separate lists of components. 
All detailed illustrations are marked with symbols:

         
 seen from inside         seen from outside.

Precautions.

 

Assembly must only be carried out in 
dry and calm weather.

 

Always use working gloves while glazing. 
Greenhouse glass has sharp edges, 
especially if the glass breaks.

 

Assistants and especially children must be 
warned that broken glass is an element of 
danger. Pick up broken glass at once and 
remove it with care.

 

We recommend to use protective glasses 

while fixing the spring wire clips.

 

Place the ladder on a level support.

 

It is essential to have an assistant.

References

The column marked              indicates the page(s) 
on which the component is used.

Page 13: 

Foundation

The base is not included in this delivery. 
However, an optional base can be bought 
separately. It ensures you have a stable and 
easy to build base. 
If you make your own base the measurements 
indicated must be external measurements.
If you buy an optional base you furthermore 
need about 40 litres of concrete and 3 
plastic-/concrete pipes of about 800 mm 
which are placed in a non-freezing depth 
for the fastening of the corner and middle 
anchors.
The base must be 100% level and square; the 
latter is ensured by checking that the two 
diagonal measurements are equal.

Tools

The mounting of the greenhouse requires 
the tools shown on page 12.

Page 14-23:

Place the components as shown on the 
illustration and assemble in the order shown 
in the pictures. Do not tighten the nuts 
completely until the front gable construction 
has been assembled.

 

Page 13:

(Fastening to the base).

When constructing your own base you 
have to drill holes (7 mm) in the ground 
frame between all the vertical frames, the 
greenhouse is then fastened to the base with 
screws (A). 
Using an optional base the greenhouse is 
fastened to each vertical bar as shown on 
drawing B.

Fitting of glass

Important before glazing! 

Make sure that gables and sides are level and 

square, and that door(s) and window(s) are 

functioning perfectly. 

Best order of assembly:

1) Front – 2) Roof – 3) Attachment to the wall 

4)  Door – 5) Window - 6) Glazing

Remember to insert exstra bolts, in profile no. 

931 and 932

Page 22-23:

Glazing 

Degrease the sheets and frames with spirit.

Start glazing from below, one glass at a time. 
Fit glazing strip (411) to all glazing bars, 
gable bars and corner posts before you begin 
to glaze the greenhouse.
Spring wire clips and glassholders are to be 

fitted as shown.

X

 = Spring wire clips, 

>

 = Glassholders

Now your greenhouse is completely 
assembled. However, please notice the 
following:

Maintenance

 

Grease doors (hinges and lock or doortrack).

 

Clean the gutter for leaves, etc.

 

Adjustment of windows.

• 

Replacement of broken glass.

 

Clean the greenhouse with disinfectant 
before and after the growing season.

Winter Protection

In areas with occurrence of snow we 
recommend the following winter protection:

 

Support the roof ridge at the centre of the 
greenhouse.

• 

Remove greater snow loads from the roof.

 

Take precautions against snow falling 
down from for instance a tree or a roof.

 

Dismount the cylinders for the automatic 
window openers, if any (optional extras).

 

Secure door(s) and window(s) preventing wind 
damage to the greenhouse.

Insurance

Please note that not all insurance companies 
cover greenhouses automatically. Please 
contact your insurance company to ensure 
an insurance coverage.

Guarantee

Juliana grants a guarantee of 12 years which 

covers replacement of faulty parts. The guarantee 
does not cover polycarbonate, glass, transport, 
assembly, freight etc. 

Juliana grants a guarantee of 2 years on painted 

parts, if any. Note that marks in the painting may 

occur due to suspension of the profiles. 

The guarantee is invalid if the greenhouse is not 
assembled according to these instructions.

Complaints

All our greenhouses are built to high standards of 
quality. However, should a complaint occur please 

contact your dealer at once. Remember to specify 

the defect by indicating the greenhouse model and 
number of the component and the quality control 
number.

May we congratulate you on your new Greenhouse

GB

USA

Содержание 42 2

Страница 1: ...42 62 Halls Wall Garden 13122010 Model 42 2 sek 62 3 sek...

Страница 2: ......

Страница 3: ...s Vigtigt f r montage Kontroller at gavle og sider er i lod og vinkel samt at d r og vindue fungerer perfekt Bedste monteringsr kkef lge 1 Front 2 Tag 3 Fastg relse til v g 4 D r 5 Vindue 6 Glas Husk...

Страница 4: ...optional base the greenhouse is fastened to each vertical bar as shown on drawing B Fitting of glass Important before glazing Make sure that gables and sides are level and square and that door s and w...

Страница 5: ...A festgeschraubt wird Haben Sie ein originales Fundament m ssen Sie das Haus bei jedem senkrechten Stab befestigen wie auf B gezeigt Montageanleitung Glas Stegdoppel platten Wichtig vor der Montage be...

Страница 6: ...ruerar fundamentet borras h l 7 mm i bottenramen mellan alla lodr tta profiler och sedan skruvas v xthuset fast p fundamentet A Om Ni anv nder orginalfundament s s tts v xthuset fast vi varje lodr tt...

Страница 7: ...se entre tous les profils horizontals avant de fixer la maison sur le fondement A Si vous employez le fondement original vous fixez la maison chaque barreau horizontal comme indiqu B Montage du verre...

Страница 8: ...op de fundering Wanneer u de fundering zelf gemaakt heeft boort u gaten 7 mm in het bodemframe tussen alle verticale profielen waarna u de kas op de fundering A vastschroeft Indien u een originele fu...

Страница 9: ...7 mm en el bastidor entre todos los perfiles verticales despu s de lo cual el invernadero se atornilla al fundamento A Si utiliza un fundamento original el invernadero se fija en todas las barras ver...

Страница 10: ...o tutta la costruzione Pagina 13 Fissaggio al basamento In caso di un basamento costruito per conto proprio necessario praticare dei fori 7 mm nel telaio di base tra tutti i profili verticali dopodich...

Страница 11: ...arten 7 mm reik kiinnitysruuvia varten joka v liin Julianan valmiin perustuksen kiinnitys tapahtuu perustuksen mukana tulevien osien avulla kuva B T rke Lasin kennolevyn asennukseen Tarkista ristimita...

Страница 12: ...emble Overzicht Resumen Schema Sis llys 12 13 14 15 16 17 18 21 22 19 20 V rkt j Tools Werkzeug Verktyg Outillage Gereedschap Herramientas Utensili Ty kalut Fittings Raccorderie Hulpstukken Garnitures...

Страница 13: ...illbeh r Accessoires Toebehoren Accesorios Accessori Lis varusteet 13 7 mm A B 42 62 1293mm 8ft 1 4 1915 mm 6ft 1 4 646mm 2ft 2 646 mm 2ft 2 1445mm 4ft 3 4 2021mm 6ft 6 2 3 1293 646 1915 2 1 4 4 16 16...

Страница 14: ...vant Voor Frente Anteriore Edess 2 3 4 1 154 155 835 832 833 154 155 839 154 155 3 4 1 2 835 835 839 839 832 833 1 mm 154 835 839 832 1235 1506 1506 1235 1 2 1 1 2 2 42 62 155 1857 1 833 1857 1 835 83...

Страница 15: ...2 3 4 5 6 2 mm 834 960 961 610 1748 680 680 2 1 1 1 1 1 42 62 828 1748 1 951 1235 2 829 1 1 1 959 1857 1 962 1 2 653 834 834 828 829 960 961 951 959 962 962 835 960 832 833 828 951 959 832 833 951 95...

Страница 16: ...der Wand Inf stning Fixation au mur Gehechtheid Afijaci n Attaccamento Liite 2 1 951 959 459 1 2 3 mm 426 406 459 11 1 12 1 42 62 1 11 12 8000 406 426 828 829 426 459 406 Fra Siden From side Ab seite...

Страница 17: ...17 D r Door T r Porte Deur Puerta Porta Ovi Vinduer Windows Fenster F nster Fen tres Ramen Ventanas Finestre Luukut Glas Glass Verre Cristales Vetro Lasit...

Страница 18: ...Ovi 479 268 840 333 2 4 1 3 4 mm 840 265 1486 620 2 2 1 2 2 1 1 1 42 62 268 1 1 610 266 620 267 620 4 267 5 7 9 8 840 266 268 265 265 840 10 12 11 6 1 2 3 13 14 478 2 2 1106 16 16 6X16 479 1 1 2 2 333...

Страница 19: ...10 12 11 1106 840 266 268 1106 840 265 1106 840 265 1106 840 478 268 267 833 13 267 478 10cm 5 265 840 1106 6 265 840 1106 7 840 268 1106 266 268 266 14 74 833 D r Door T r D rr Porte Deur Puerta Por...

Страница 20: ...indows Fenster F nster Fen tres Ramen Ventanas Finestre Luukut 2 3 4 1 4 928 43 2 1 5 929 930 929 5 mm 928 930 932 450 635 398 610 620 1 2 1 1 1 1 2 1 1 42 62 929 931 1 451 2 2 638 928 929 930 929 928...

Страница 21: ...Ramen Ventanas Finestre Luukut 5 6 7 8 932 929 961 962 11 450 930 962 932 Wall Garden 42 Wall Garden 42 9 931 931 962 Wall Garden 62 Wall Garden 62 10 Wallgarden 42 961 Wallgarden 62 962 Wallgarden 4...

Страница 22: ...22 Glas Glass Verre Cristales Vetro Lasit 458 12 mm 453 X 82 X 82 X 1 2 m m 1 2 3 4 5 8 7 6 411...

Страница 23: ...A A C B B E E E B A A A A A A A A C B E E B DD DD x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x...

Страница 24: ...24 This product is delivered by a company in the Juliana Group www juliana com...

Отзывы: