10
Hali-Brite® L-801H(L) Installation and Maintenance Manual
Determine the beacon mounting location, and drill four
½” holes in the platform,
spaced as shown in Figure 1.
Figure 1
If the surface is not level, spacers or shims will be needed. Place a level on top of
the weather cap and use shims as necessary under the four corners to bring the
beacon to level. Install and tighten the mounting bolts, four each #1/2-13 bolts,
length as required.
4.3.2 Wiring
See Figure 2 to locate the power connection point. The power cord enters the
beacon chassis through the hole in the base, and attaches to the white terminal
block in the lower right corner.
Figure 2
Power
Terminal
Block