Halfen HIT-BX Скачать руководство пользователя страница 2

 

 

Instructions

 

HALFEN HIT Insulated Balcony Connection

 

HIT-US 05/12 

Page 2/2 

 

 

 

Type HIT-BX-ECK 

 

 

 

 

 

 

 

The HIT-BX-ECK unit is supplied in two sections 

 

Install bottom reinforcement of the floor and the balcony 

slab. 

 

Place and correctly align the lower section of the HIT-

BX-ECK unit and the HIT-BX unit 

.

 

 

Install top reinforcement of the floor slab in the direction 

of the bars on the lower section of the HIT-BX-ECK unit 
and secure by wire ties. 

 

Place and align the upper section of the HIT-BX-ECK 

unit. Check that the red arrow on the top of the unit is 
pointing towards the balcony (see illustration below). 
Install top reinforcement of the floor slab in the direction 
of the bars on the upper section of the HIT-BX-ECK unit 
and secure by wire ties. 

 

Install bottom and top reinforcement of the balcony and 

additional edge reinforcement and secure by wire ties to 
the HIT unit bars. 

When pouring the concrete to form the floor and balcony 
slabs check that it is poured and compacted equally to 
prevent displacement of the HIT units. Also double-check 
the level of the balcony slab!

 

 

 

 

 

Type HIT-BD 

 

 

 

 

 

 

 

 

 

 

Lay the lower and 

 

edge slab reinforcement. 

 

Place the HIT-BD unit; align it; check that the red arrow 

on the top of the unit is pointing towards the balcony 
(see illustration below); and tie it to the slab 
reinforcement. The assembly cross bars of the HIT 
element can be cut if needed. 

 

Lay the lower and upper longitudinal slab 

reinforcement. 

 

Install the upper slab reinforcement. 

 

Insert the lower and edge reinforcement 

 of the 

balcony. The perpendicular reinforcing bars are 
positioned above the bars of the HIT unit. 

 

Lay the lower and upper longitudinal balcony 

reinforcement. 

 

Lay the upper balcony reinforcement and wire it to the 

HIT unit bars. The perpendicular reinforcement must 
be positioned below the bars of the HIT unit. 

When pouring the concrete to form the floor and balcony 
slabs check that it is poured and compacted equally to 
prevent displacement of the HIT units. Also double-check 
the level of the balcony slab!

 

 

 

 

 

 

 

 

 

Halfen USA Inc. 

 

 

8521 FM 1976, Converse, TX 78109, United States of America 
Phone: +1 800.423.9140 
Fax: +1 210.658.8312 
[email protected] 
www.halfenusa.com

 

© 2012 HALFEN · Inst-HIT-US 05/2012 · www.halfenusa.com 

 

Extract from product label 
indicating position of HIT 
unit relative to balcony 

 

Extract from product label 
indicating position of HIT 
unit relative to balcony 

 

balcony 

 

floor slab 

 

HIT-BD 

balcony 

 

floor slab 

Отзывы: