EB+ Soft Docking
Installation guide
14
Innovative Vehicle Solutions
2020
Installation of EB+ Soft Docking ECU
Preparation
Ensure that you have all the components necessary to
complete the installation.
Remove existing outline markers.
Determine a suitable mounting point for:
›
EB+ Soft Docking ECU box
›
Audio beeper
Minimum space required is approximately 200 mm
(width) x 300 mm (height).
All cables must be installed where suitably protected
by the trailer chassis. Fix all cables every 10-15 cm with
a cable tie. Do not fit the cables onto surfaces that can
become hot. Hydraulic fluid pipe lines are not allowed.
Unnecessary cables should be fixed coiled up. Ensure
that any junction box gland nuts are closed correctly.
During all the installation, protect connectors from dirt
and humidity.
Temperature range :
Don’t expose the product below -40 °C and above
80 °C. For example, do not place the product in a paint
oven (temperature > 80 °C). Fit the EB+ Soft Docking
after painting.
The position of the ECU box should be in a suitably
protected position in the rear part of the trailer. The
box should be fixed onto the chassis. Position in a rigid
location which is not susceptible to large vibration
and ensure cables run upwards to the ECU box and
are safely installed. Respect the "Top" indicated on
the box. The cables must be plugged without any
constraints (which could cause a loss of tightness or
product deterioration). Any product opening or any
product change cancels the product warranty.
Note: Ensure that the ECU connectors are plugged
into the correct colour coded cable connectors, and
the polarity of these connectors is also correct. Any
deviations from correct connection will void any
warranty claims.
Mounting dimensions
102.21 mm
120 mm
75.5 mm
134 mm
Use M6 screw
Screwing torque = 8 Nm max for M6
screws
Fit the box onto a flat surface
Top
Bottom
Green connector Brown connector
Содержание EB+ Soft Docking
Страница 1: ...Innovative Vehicle Solutions INSTALLATION GUIDE Soft Docking...
Страница 57: ...EB Soft Docking Installation guide 57 2020 Innovative Vehicle Solutions AK...
Страница 58: ...EB Soft Docking Installation guide 58 Innovative Vehicle Solutions 2020 06 12 16 06 12 16...
Страница 59: ...EB Soft Docking Installation guide 59 2020 Innovative Vehicle Solutions...
Страница 60: ...EB Soft Docking Installation guide 60 Innovative Vehicle Solutions 2020...
Страница 61: ...EB Soft Docking Installation guide 61 2020 Innovative Vehicle Solutions...
Страница 62: ...EB Soft Docking Installation guide 62 Innovative Vehicle Solutions 2020...
Страница 63: ...EB Soft Docking Installation guide 63 2020 Innovative Vehicle Solutions AK AK...
Страница 64: ...EB Soft Docking Installation guide 64 Innovative Vehicle Solutions 2020 AK AK...
Страница 65: ...EB Soft Docking Installation guide 65 2020 Innovative Vehicle Solutions 22 01 15...
Страница 66: ...EB Soft Docking Installation guide 66 Innovative Vehicle Solutions 2020 AK AK...
Страница 67: ...EB Soft Docking Installation guide 67 2020 Innovative Vehicle Solutions...
Страница 68: ...EB Soft Docking Installation guide 68 Innovative Vehicle Solutions 2020...
Страница 69: ...EB Soft Docking Installation guide 69 2020 Innovative Vehicle Solutions...
Страница 70: ...EB Soft Docking Installation guide 70 Innovative Vehicle Solutions 2020 pp PMcM 01 10 14 01 10 14 01 14 14...
Страница 71: ...EB Soft Docking Installation guide 71 2020 Innovative Vehicle Solutions 30 09 14 30 09 14...