03-7175-00-00.fm
33
Putting into service
3 Putting into service
3.1
Instruction
Instruction is required before the first start-up. The first-time instruction of the
machine may be provided only by a specialist of your authorised Hako dealer.
This person will be notified immediately after delivery of the machine from the
factory and will contact you to make an instruction appointment.
3.2
Before putting into service
3.3
Checklist – before machine start-up
Attention
• Before initially starting up the machine, charge the used batteries
fully and appropriately with commissioning charge. Please
observe the operating manual of the charger and the operating
manual of the battery manufacturer. Hako assumes no liability for
battery damage resulting from insufficient commissioning charge.
• Before the machine is initially put into service, install the country-
specific Hako mains cable.
• Check the machine for operating safety before every start-up!
Eliminate faults immediately.
• Before starting work, the operator must familiarize himself with all
equipment, operating and actuating elements as well as with their
function.
No. Description
1 Checking the parking area for signs of leaks. Cables and tanks must not
show any sign of leaks or damage
2 Installing the mains cable
3 Mounting the brushes and squeegee, see chapter Maintenance
4 Adjusting the driver's seat, if necessary, see section 3.3.2
5 Checking the battery charge and recharge it as required,
see chapter Maintenance
6 Emptying the waste water tank and clean it as required,
see chapter Maintenance
7 Filling the solution tank (see chapter Maintenance) and add cleaning
agent according to the manufacturer's specifications
Содержание Scrubmaster B75R
Страница 20: ...20 02 7175 00 00 fm Operation Fig 4 23 22 21 25 24 26 27 28 30 32 31 19 17 18 20 29...
Страница 77: ...77...