HAKKEN SPZ-252U2i Скачать руководство пользователя страница 1

 

 

 
 
 

 

DIAMOND CORE DRILL

 

SPZ-252U

2

 
 
 
 
 

  INSTRUCTION MANUAL   

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

 

  Thank you for purchasing our products. 

  Before using, please read Instruction manual carefully, and use the machine 

safely by following the instructions. 

  After reading, please keep it where anyone can utilize. 

Содержание SPZ-252U2i

Страница 1: ...U2i INSTRUCTION MANUAL Thank you for purchasing our products Before using please read Instruction manual carefully and use the machine safely by following the instructions After reading please keep it...

Страница 2: ...ION The instruction manual includes two signal words WARNING CAUTION which are meant as follows WARNING It is assumed that if the user uses the machine wrongly it would be the risks that the user coul...

Страница 3: ...IFICATIONS 8 4 STANDARD ACCESSORIES 8 5 APPLICATIONS 8 6 GENERAL DRAWING AND SPECIFICATIONS IN OPERATION 9 7 OPERATIONAL INSTRUCTIONS 1 Anchoring Core Drill 10 2 Anchoring Core Drill by Anchor Bolt 10...

Страница 4: ...Wear cap or hair cover in case that you have long hair 5 Wear ear protector such as earplug or ear muffs Wear ear protector in the place of noise 6 Wear safety glasses Wear safety glasses during worki...

Страница 5: ...ch please make sure that the key and the wrench which are used for the inspection and adjusting are removed 15 The electric machines are maintained carefully Regarding exchanging the options please fo...

Страница 6: ...en please start operating 6 Use the proper voltage which is indicated on the nameplate In case that you apply for the voltage which is over the indicated voltage it will cause the accidents 7 Fix the...

Страница 7: ...fely and efficiently 2 When drilling please supply the water for sure Overheating of Core Bit reduces not only drilling performance but also its life So make sure to keep supplying water during drilli...

Страница 8: ...e Base After combining with Drill Carriage and Pole Base the distributor must make a CE marking and issue CE DECLARATION OF CONFORMITY 2 Drill Carriage Assy and Pole Base which are mounted on Drill Mo...

Страница 9: ...cuit Breaker Carbon Cap Name Plate Feeding Handle Unified screw 1 1 4 7 UNC The outside of Main Shaft Lock Dial Clamp Adjust Bolt Hex Socket Set Screw Grip Hose Band 00 Standard Accessories Plug Hose...

Страница 10: ...uding cord 13 6kg Max Burst Pressure Hose 3 9MPa 4 STANDARD ACCESSORIES Hose Band 00 1 Hose 12 250 1 Water Cock 1 4 Gardena 1 Hex Bar Wrench 4mm 1 Instruction Manual 1 5 APPLICATIONS This tool is Core...

Страница 11: ...CIFICATIONS IN OPERATION Drill Head installed on to 49 Pole Base Drill Motor Feeding Handle Core Bit Water Collector 49 Pole Base Bolt Square Washer Hex Nut Leveling Bolt Water Collector Fitting Drill...

Страница 12: ...ign main shaft with the hole to be drilled 5 Adjust leveling with leveling bolts so as to eliminate rattling of pole base After completion of adjustment secure leveling bolt with wing nut 6 Tighten he...

Страница 13: ...on Start drilling by turning feeding handle slowly until Core Bit in light contact with work surface While starting to drill apply light pressure on feeding handle until drill bit penetrates to 5 10mm...

Страница 14: ...with the soapy water 2 Maintenance for motor After entire operation is over secure Drill Head onto Pole Base run motor with no load and remove dirt and dust from motor interior 2 Regular Servicing 1...

Страница 15: ...gets heavy When slide plate is worn and starts to rattle replace it 3 Checking and adjustment of clutch As Friction Plates wear out the clutch becomes easy to slip When this happens readjust the clutc...

Страница 16: ...is locked Turn the motor switch on for just a moment and make sure that the clutch is slipping without motor locking WARNING Be careful for the position of Single ended Wrench 36mm touching on pole S...

Страница 17: ...s at a distance of 1 meter from the surface of the machinery and at height of 0 8 meter from the floor during no load operation 11 WARRANTY We will guarantee the HAKKEN Core Drill SPZ 252U2i for 6 mon...

Страница 18: ...Z 252U2i Council Directive 2006 95 EC 2004 108 EC 2006 42 EC Relative Standard EN292 1 EN292 2 EN55014 1 EN55014 2 EN61000 3 2 EN61000 3 3 EN61000 4 2 EN61000 4 4 EN61000 4 5 EN61000 4 6 EN61000 4 11...

Страница 19: ...17 MEMO...

Страница 20: ...18 Main office 4 6 8 Shoko Center Nishi ku Hiroshima 733 0833 Japan International Department 1 7 5 1 Sakaimachi Naka ku Hiroshima 730 0853 Japan Phone 81 82 297 3231 Fax 81 82 297 3230 E1930 1...

Отзывы: