background image

7

Stair UTV 

 

UTV 3050x2000  

2092200

 39.7 

With platform and locking catch at the top 

 

 

 

LxH 3050x2000 mm 

 

 

 

Width 600 mm 

 

Handrail 

 

HL 3050x2000  

2161300

 19.3

 

  

 

 

  

 

Handrail inner UTV 

 

HLI  

7058254

                     11.5 

Bracket handrail post

 

FF-UTV  

8752001

 2.5 

For stair UTV steel 2092200 

 

 

 

 

  

 

 

  

 

Handrail post

 

LSS 1000 

7015102

 4.2

As guardrail post  

 

 

 

Landing link panel UTV AL/Frame 

  

7211044

 3.6 

For covering the hole between  

 

 

 

platform and frame

Only for UTV UTV 3050x2000 AL

Safety gate with net SGF

  

SGF 1655  

7055161

 17.0 

Continuously adjustable in height 

SGF 1964 

7055191

 19.4 

Jaw width 22 mm 

SGF 2500 

7055250

 23.2 

 

SGF 3050 

7055300

 26.8

Transom intermediate level

  

TP 700  

8743701

 3.7 

Jaw width 22 mm

Platform locking 

  

LSB 0.7  

8744700

 2.3 

 

LSB 700 

8744701

 2.3

Transom ground level

  

ULB 700  

8743700

 2.4

LIST OF COMPONENTS

Name 

Code 

Item No. 

Weight 

Содержание 564

Страница 1: ...HAKI AB 2014 USER S MANUAL...

Страница 2: ...ever HAKI has no objection to the customary addition of scaffold tubes and approved couplers to the scaffold Adding components from different suppliers may invalidate the insurance cover HAKI reserves...

Страница 3: ...g unit Frame 2000 Guardrail frame Toe board clip Toeboard Base jack General data The HAKI Ram scaffolding system consists of vertical frames decking units and guardrail frames The scaffolding is erect...

Страница 4: ...ard L frame RAL 1000 8734100 6 1 Guardrail frame AL SKRD 1655 AL 4052161 5 9 With spring locking catch SKRD 1964 AL 4052191 6 6 SKRD 2500 AL 4052246 7 8 SKRD 3050 AL 4052301 8 9 Guardrail frame GFL 16...

Страница 5: ...dth 22 mm Decking unit B 620 mm Load class 3 2 0 kN m2 PL 1655x620 AL 4081160 11 7 PL 1964x620 AL 4081190 14 0 PL 2500x620 AL 4081250 18 3 PL 3050x620 AL 4081300 22 5 B 310 mm Load class 3 2 0 kN m2 P...

Страница 6: ...ngle coupler RA 48x48 22 mm 2041010 1 0 Jaw width 22 alt 23 mm RA 48x48 22 mm 2048010 1 2 Wall tie VST 1000 7111100 5 3 With flexible plate VST 2000 7111200 9 1 Two 22 holes in the plate VST 3000 7111...

Страница 7: ...il post Landing link panel UTV AL Frame 7211044 3 6 For covering the hole between platform and frame Only for UTV UTV 3050x2000 AL Safety gate with net SGF SGF 1655 7055161 17 0 Continuously adjustabl...

Страница 8: ...with tensile load e g when lifting or when scaffolding is used for temporary roof Not for suspended scaffolding Pavement frame 1460 8732201 39 5 With two fixed and two adjustable spigots Bay width 146...

Страница 9: ...are designed to provide access to the upper decks from the inside of the scaffold 10 If the scaffold is to be used outdoors erection or dismantling work must be discontinued if the weather conditions...

Страница 10: ...cting always check care fully that the material is not damaged Damaged material must not be used For more information on damaged material and renovation please refer to the HAKI Safety Guide 2 Erect t...

Страница 11: ...the scaffolding Toeboards must then be added RAL 1000 L frames are otherwise fitted Alternatively RA 2000 frames can be used for the entire top lift Dismantling is carried out in reverse order Scaffol...

Страница 12: ...t a height of 1 0 m and provide the top end with an GFL 700 guardrail frame Erect the next lift using a stairway frames handrail and guardrail frames The gap between the scaffold and the stairway is c...

Страница 13: ...scaffold tubes 11 SK 700 internal brackets Where required provide the decking on brackets with end guardrails with the aid of L frames Lock the L frames using locking pins and locking hooks 12 SK 700...

Страница 14: ...0 brackets are used as the basis for cantilevered scaffolding starting at any level 13 SK 800 external brackets A maximum of three frames or scaffolding of 6 0 m in height can be erected on reinforced...

Страница 15: ...f guardrail frames cannot be erected between the base frames i e between C and D SR 48 scaffold tubes are fitted between the outer standards using swivel couplers Pavement frames 17 Pavement frames ar...

Страница 16: ...he bottom Cantilevered scaffolding and the lift below the cantilevered scaffolding must be anchored at every lift level Frames with lattice beams must be anchored at the fixing points of the beams The...

Страница 17: ...h mm Load class Permissible load kN m2 Main scaffolding decking 620 1655 3050 3 2 0 Bracket decking 310 1655 3050 3 2 0 Permissible construction heights for HAKI Ram Aluminium LOADING CONDITIONS Permi...

Страница 18: ...eams are fitted in pairs on the inside and outside of the scaffold Both the top and bottom tubes must be fixed to the frames using KV 48x48 right angle couplers The height of the beams is adjusted so...

Страница 19: ...ial 4 Components must be sorted and stacked properly Take care not to pile the stacks too high so that the material lower down in the stacks becomes overloaded and damaged If the material must be stac...

Страница 20: ...of attachment apply provided that the com ponent in question is otherwise without load and that only one person is attached to the same component at any one time Components that have been subjected to...

Страница 21: ...21 Notes...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...lly and vertically 4 Components correctly fitted and locked 5 Bracing correctly fitted 6 Anchoring with right number and placing of ties 7 Decking correctly fitted 8 Guardrail with toeboard if drop is...

Отзывы: