39
Step3.
Install TPV edid tool. Take Haier LY19Z6 for example:
1. Double click this icon to install.
2. Double click this icon to run.
2. Choose the VGA EDID file.
3. Click anyone file to
add VGA EDID file.
4. Click here to Read the file
This red frame contents detail information in VGA EDID file.
1. Click here to open this interface.
Содержание L19
Страница 17: ...17 4 Mechanical Instructions Step1 Remove the STAND ASS Y Step2 Remove the REAR COVER ...
Страница 19: ...19 Step 5 Separate the MAIN FRAME and PANEL Step 6 Remove the KEY BOARD IR BOARD and SPEAKERS ...
Страница 27: ...27 6 PCB Layout 6 1 Main Board 715G3759M02000005K ...
Страница 28: ...28 ...
Страница 29: ...29 6 2 Power Board 715G3754P01W30003H ...
Страница 30: ...30 ...
Страница 31: ...31 ...
Страница 32: ...32 6 3 Key Board 715G3303 2 6 4 IR Board 715G3963R01000004S ...